TEXAS · WELLS · DUVAL COUNTY · DCR - STATE SEC. 260N LEASE · API 42-131-38176 · DISTRICT 04
DCR - State Sec. 260N #3
Duval County · Hagist Ranch ( 750) field · Temp Abandoned · Vertical
Dcr - State Sec. 260n #3 (API 42-131-38176) is a well in Duval County operated by Killam Oil CO. Ltd., completed April 16, 1997 and listed as temp abandoned on the RRC schedule, shut in March 1, 1998.
The RRC has issued one drilling permit (amended once), issued March 21, 1997, permitted to 1,910 ft.
Completion filings report one formation top, including Frio.
Its lease has reported 236 mcf of gas since April 1997, with no volume in the three years through April 2026.
Operator of record
- Based in
- Laredo, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 9, 2026
- Permits on file
- 837
- Phone
- (956) 724-7141
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Killam Oil Co. Ltd. |
| Production reports | Killam Oil Co., Ltd.through Feb 1998 |
| Latest permit | Killam Oil Co., Ltd.Mar 21, 1997 |
- 1,910
- total depth, ft
- 2
- permits on file
- Mar 21, 1997
- last permit issued
- Apr 16, 1997
- completed
- 0
- cumulative oil, bbl
- 236
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Feb 1998
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 16, 1997
- Shut in
- Mar 1, 1998
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| DCR - State Sec. 260N G-4-166565 | Hagist Ranch ( 750) | Killam Oil Co., Ltd. | 1 | 0 | 236 | Apr 1997 – Feb 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Killam Oil Co., Ltd.Sep 1997 → Feb 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 460169-98 | Drill | Killam Oil Co., Ltd. | Jul 17, 1997 | Mar 21, 1997 | Mar 24, 1997 | 2,000 |
| 460169-99 | Drill | Killam Oil Co., Ltd. | Mar 20, 1997 | Mar 21, 1997 | — | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 16, 1997 | DCR - State Sec. 260N G-4-166565 | Hagist Ranch ( 750) | Killam Oil Co. Ltd. | Temp Abandoned · shut in Mar 1, 1998 | 1,910 |
Formation tops
As filed on W-2/G-1. Subsea from 423 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Frio | 750 | -327 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 796 | 800 | Perforated |
| 830 | 834 | Perforated |
| 834 | 844 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 939 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 12, 1998 | Feb 13, 1998 | Yes |
| 00 | Feb 25, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-38176 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-38176 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13138176, documented in the API reference.