TEXAS · WELLS · DUVAL COUNTY · MILLER LEASE · API 42-131-38184 · DISTRICT 04

Miller #5

Shut in

Duval County · Longhorn South (4200) field · Temp Abandoned  · Vertical

Miller #5 (API 42-131-38184) is a well in Duval County operated by Proline Energy Resources Inc, completed April 29, 1997 and listed as temp abandoned on the RRC schedule, shut in April 1, 2001.

The RRC has issued one drilling permit (amended once), issued April 7, 1997, permitted to 6,014 ft.

It was permitted by Edge Petroleum Oper. CO., Inc. and has since transferred to Proline Energy Resources Inc on the wellbore schedule.

Completion filings report one formation top, including Cole.

Its lease has reported 394 barrels of oil and 69.8K mcf of gas since April 1997, with no volume in the three years through April 2026.

Operator of record

Proline Energy Resources Inc

Permitted by Edge Petroleum Oper. Co., Inc.; the EWA schedule now lists a different operator.

Based in
Sugar Land, TX
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Phone
(832) 886-4420

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleProline Energy Resources Inc
Production reportsProline Energy Resources Incthrough Mar 2001
Latest permitEdge Petroleum Oper. Co., Inc.Apr 7, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,014
total depth, ft
2
permits on file
Apr 7, 1997
last permit issued
Apr 29, 1997
completed
394
cumulative oil, bbl
69.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1997 THROUGH Mar 2001

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 29, 1997
Shut in
Apr 1, 2001
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Miller G-4-164361Longhorn, South (4200)Proline Energy Resources Inc139469.8KApr 1997 – Mar 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Edge Petroleum Oper. Co., Inc.May 1997 → Mar 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
460831-98DrillEdge Petroleum Oper. Co., Inc.Aug 20, 1997Apr 7, 1997Apr 18, 19976,100
460831-99DrillEdge Petroleum Oper. Co., Inc.Apr 7, 1997Apr 7, 1997—6,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 29, 1997Miller G-4-164361Longhorn South (4200)Proline Energy Resources IncTemp Abandoned · shut in Apr 1, 20016,014

Formation tops

As filed on W-2/G-1. Subsea from 386 ft elevation.Download CSV →

FormationMD ftSubsea
Cole4,200-3,814

Perforations

Perforated and open-hole intervals.

FromToType
4,2014,206Perforated
4,2114,213Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62563212.25240 S
2.8754,4177.875978 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 6, 1997Aug 11, 1997Yes
00Sep 25, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13138184, documented in the API reference.