WELL · 42-131-38294 · DISTRICT 4

Sun #2

Plugged

Duval County · Rich Hurt (Wx. 2ND Hinnant) field  · Vertical

Sun #2 (API 42-131-38294) is a plugged well in Duval County, plugged September 18, 2019, last operated by Killam Oil CO. Ltd..

The RRC has issued 2 drilling permits between 1998 and 2001, permitted to 12,500 ft.

It was permitted by Huber, J. M., Corporation and has since transferred to Killam Oil CO. Ltd. on the wellbore schedule.

Completion filings report 5 formation tops, including Frio, Jackson, Yegua, Queen City.

Operator of record

Killam Oil Co. Ltd.

Permitted by Huber, J. M., Corporation; the EWA schedule now lists a different operator.

Based in
Laredo, TX
P-5 status
Active (A)
P-5 last filed
Apr 9, 2026
Permits on file
837
Phone
(956) 724-7141

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKillam Oil Co. Ltd.
Production reportsKillam Oil Co., Ltd.through Mar 2019
Latest permitHuber, J. M., CorporationApr 23, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,500
total depth, ft
2
permits on file
Apr 23, 2001
last permit issued
Jun 4, 2001
completed
0
cumulative oil, bbl
2.65M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1998 THROUGH Sep 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 4, 2001
Shut in
—
Plugged
Sep 18, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sun G-4-171100Rich Hurt (Wx. 4TH Hinnant)Killam Oil Co., Ltd.101.81MNov 1998 – Sep 2019
Sun G-4-184156Rich Hurt (Wx. 2ND Hinnant)Killam Oil Co., Ltd.10841KJun 2001 – Sep 2019

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Nov 1998 → Aug 1999
  2. 2Huber, J. M., CorporationSep 1999 → Jun 2003
  3. 3Killam Oil Co., Ltd.Jul 2003 → Mar 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
508058-99RecompletionHuber, J. M., CorporationApr 23, 2001Apr 23, 2001May 31, 20018,930
480066-99DrillMobil Producing TX. & N.M. Inc.Oct 12, 1998Oct 12, 1998Oct 26, 199812,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 4, 2001Sun G-4-184156Rich Hurt (Wx. 2ND Hinnant)Killam Oil Co. Ltd.Plugged—
Nov 25, 1998Sun G-4-171100Rich Hurt (Wx. 4TH Hinnant)Killam Oil Co. Ltd.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 643 ft elevation.Download CSV →

FormationMD ftSubsea
Frio1,683-1,040
Jackson2,390-1,747
Yegua3,238-2,595
Queen City5,670-5,027
Wilcox7,870-7,227

Perforations

Perforated and open-hole intervals.

FromToType
8,3048,324Perforated
8,7348,744Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
16.560——
9.6251,26112.25440 S
76,6348.75415 S
4.58,9306.25150 S
4.5—6.25150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 15, 2001Jun 27, 2001Yes
00Sep 10, 2001——
00Jan 13, 1999Dec 15, 1998Yes
00Dec 30, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13138294, documented in the API reference.