TEXAS · WELLS · DUVAL COUNTY · CUELLAR 123 LEASE · API 42-131-38321 · DISTRICT 04

Cuellar 123 #4

Plugged

Duval County · SVD (Yegua D) field  · Vertical

Cuellar 123 #4 (API 42-131-38321) is a plugged well in Duval County, plugged January 25, 2001, last operated by Sanchez Oil & Gas Corporation.

The RRC has issued 2 drilling permits (amended once) between 1999 and 2000, permitted to 4,500 ft.

Completion filings report 6 formation tops, including Cole, Mirando, Pettus "A", Pettus "B".

Operator of record

Sanchez Oil & Gas Corporation

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 11, 2026
Permits on file
541
Phone
(713) 783-8000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSanchez Oil & Gas Corporation
Production reportsSanchez Oil & Gas Corporationthrough May 2000
Latest permitSanchez Oil & Gas CorporationJan 25, 2000
4,500
total depth, ft
3
permits on file
Jan 25, 2000
last permit issued
Mar 20, 1999
completed
0
cumulative oil, bbl
358K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1999 THROUGH Jan 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 20, 1999
Shut in
—
Plugged
Jan 25, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cuellar 123 G-4-172714SVD (Yegua D)Sanchez Oil & Gas Corporation10358KMar 1999 – Jan 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sanchez Oil & Gas CorporationMar 1999 → May 2000

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
491417-98RecompletionSanchez Oil & Gas CorporationApr 5, 2000Jan 25, 2000—3,500
491417-99RecompletionSanchez Oil & Gas CorporationJan 25, 2000Jan 25, 2000—3,500
483086-99DrillSanchez Oil & Gas CorporationMar 4, 1999Mar 4, 1999Mar 10, 19994,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 20, 1999Cuellar 123 G-4-172714SVD (Yegua D)Sanchez Oil & Gas CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 670 ft elevation.Download CSV →

FormationMD ftSubsea
Cole2,030-1,360
Mirando2,937-2,267
Pettus "A"3,116-2,446
Pettus "B"3,152-2,482
Pettus "C"3,224-2,554
Pattus "D"3,353-2,683

Perforations

Perforated and open-hole intervals.

FromToType
3,3503,362Perforated
3,3873,390Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62569112.25375 S
53,4428.5330 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 19, 1999Apr 8, 1999Yes
00May 7, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13138321, documented in the API reference.