TEXAS · WELLS · DUVAL COUNTY · API 42-131-38336 · DISTRICT 04

Texaco DCR (MF) 59 #2

Shut in

Duval County · Tyler T (Queen City #1) field · SWR-10-Well  · Vertical

Texaco Dcr (MF) 59 #2 (API 42-131-38336) is a well in Duval County operated by Killam Oil CO. Ltd., completed December 9, 2000 and listed as swr-10-well on the RRC schedule, shut in June 1, 2002.

The RRC has issued 2 drilling permits (amended once) between 1999 and 2001, permitted to 5,850 ft.

Completion filings report one formation top, including Queen City.

Its 2 leases have reported 2.14K barrels of oil and 280K mcf of gas since December 2000, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Killam Oil Co. Ltd.

Based in
Laredo, TX
P-5 status
Active (A)
P-5 last filed
Apr 9, 2026
Permits on file
837
Phone
(956) 724-7141

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKillam Oil Co. Ltd.
Production reportsKillam Oil Co., Ltd.through May 2002
Latest permitKillam Oil Co., Ltd.Apr 12, 2001
5,850
total depth, ft
3
permits on file
Apr 12, 2001
last permit issued
Dec 9, 2000
completed
2.14K
cumulative oil, bbl
280K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2000 THROUGH May 2002

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 9, 2000
Shut in
Jun 1, 2002
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Texaco DCR (MF) 59 G-4-180946Tyler T (Queen City #2)Killam Oil Co., Ltd.12.14K280KDec 2000 – May 2002
Texaco DCR (MF) "59" G-4-182164Tyler T (Queen City #1)Killam Oil Co., Ltd.100Dec 2000 – —

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Killam Oil Co., Ltd.Dec 2000 → May 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
507541-99RecompletionKillam Oil Co., Ltd.Apr 9, 2001Apr 12, 2001Nov 15, 20006,500
486117-98DrillKillam Oil Co., Ltd.Oct 20, 2000Jul 26, 1999Nov 15, 20006,500
486117-99DrillKillam Oil Co., Ltd.Jul 23, 1999Jul 26, 1999—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 9, 2000Texaco DCR (MF) 59 G-4-182164Tyler T (Queen City #1)Killam Oil Co. Ltd.SWR-10-Well · shut in Dec 1, 20005,850
Dec 9, 2000Texaco DCR (MF) 59 G-4-180946Tyler T (Queen City #2)Killam Oil Co. Ltd.Temp Abandoned · shut in Jun 1, 20025,850

Formation tops

As filed on W-2/G-1. Subsea from 555 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City5,440-4,885

Perforations

Perforated and open-hole intervals.

FromToType
5,4935,503Perforated
5,5335,538Perforated
5,5415,544Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62550012.25230 S
4.55,8507.875260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 20, 2001Apr 23, 2001—
00May 7, 2001——
00Apr 26, 2001Feb 12, 2001Yes
00Mar 2, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13138336, documented in the API reference.