TEXAS · WELLS · EASTLAND COUNTY · API 42-133-01738 · DISTRICT 6E

Hittson W.T. #2

Y

Eastland County · C.F.U. (Duffer Lime) field · Producing  · Vertical

Hittson W.T. #2 (API 42-133-01738) is a well in Eastland County operated by Great American Resources Inc., completed October 5, 2006 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 31, 1989, permitted to 3,420 ft.

It was permitted by Cholla Petroleum, Inc. and has since transferred to Great American Resources Inc. on the wellbore schedule.

Its 3 leases have reported 28.9K barrels of oil and 1.17M mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Great American Resources Inc.

Permitted by Cholla Petroleum, Inc.; the EWA schedule now lists a different operator.

Based in
Bowie, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 23, 2026
Permits on file
8
Phone
(940) 894-2014

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCholla Petroleum Inc.
Production reportsGreat American Resources Inc.through Oct 2025
Latest permitCholla Petroleum, Inc.Aug 31, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,420
total depth, ft
1
permits on file
Aug 31, 1989
last permit issued
Oct 5, 2006
completed
28.9K
cumulative oil, bbl
1.17M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 5, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Hearing (H)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hittson, W.T. O-8-25539C.F.U. (Duffer Lime)Great American Resources Inc.128.9K958KJan 1993 – Jul 2026
Hittson, W. T. G-8-208884C.F.U. (Duffer Lime)Cholla Petroleum, Inc.10209KApr 2005 – Apr 2010
— O-8-1615——000—

Gas, mcf lease total

Last 12 months 6,609 · prior 12 13,583(-51%)

05001K1.5K202420252026

Oil, barrels lease total

Last 12 months 398 · prior 12 775(-49%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cholla Petroleum, Inc.Jan 1993 → May 2024
  2. 2Great American Resources Inc.Jun 2024 → Oct 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
363460-99DrillCholla Petroleum, Inc.Aug 31, 1989Aug 31, 1989—3,420

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 5, 2006Hittson W.T. O-8-25539C.F.U. (Duffer Lime)Great American Resources Inc.Producing3,420
May 12, 1930Hittson W. T. G-8-208884C.F.U. (Duffer Lime)Cholla Petroleum Inc.Not on Schedule—
—Hittson W. T. O-8-1615Eastland County RegularCholla Petroleum Inc.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
3,4053,420Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,769——
6.6253,405——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 19, 2010Dec 11, 2009—
00Jan 6, 2006May 11, 2005—
00Jun 28, 2005——
00Jan 12, 1990Sep 12, 1989—
00Oct 3, 1989——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13301738, documented in the API reference.