TEXAS · WELLS · EASTLAND COUNTY · G-8-115200 LEASE · API 42-133-31102 · DISTRICT 6E

Travis Manning #1

Plugged

Eastland County · Tee Jay (3700) field  · Vertical

Travis Manning #1 (API 42-133-31102) is a plugged well in Eastland County, plugged May 8, 1990, last operated by Enre Corp..

The RRC has issued one drilling permit, issued August 1, 1977, permitted to 4,000 ft.

It was permitted by West Artesia Transmission CO. and has since transferred to Enre Corp. on the wellbore schedule.

Completion filings report 3 formation tops, including Caddo, Lake Sand, Duffer.

Operator of record

Enre Corp.

Permitted by West Artesia Transmission Co.; the EWA schedule now lists a different operator.

Based in
San Antonio, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 22, 2000
Permits on file
429
Phone
(210) 826-0681

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnre Corp.
Production reportsnone
Latest permitWest Artesia Transmission Co.Aug 1, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
Aug 1, 1977
last permit issued
Aug 18, 1977
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 18, 1977
Shut in
—
Plugged
May 8, 1990

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-8-115200——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
4399-99DrillWest Artesia Transmission Co.Aug 1, 1977Aug 1, 1977Aug 4, 19774,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 18, 1977Manning Travis O-8-13779Tee Jay (3700)Enre Corp.Plugged—
Aug 18, 1977Travis Manning G-8-115200Tee Jay (3700)Enre Corp.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,548 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo3,462-1,914
Lake Sand3,712-2,164
Duffer3,990-2,442

Perforations

Perforated and open-hole intervals.

FromToType
3,7123,720Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251161185 S
4.54,0177.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 13, 1985Feb 20, 1985—
00May 3, 1985——
00Jan 12, 1984Aug 22, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13331102, documented in the API reference.