TEXAS · WELLS · EASTLAND COUNTY · API 42-133-31419 · DISTRICT 7B

Texfel 20 #1

Plugged

Eastland County  · Vertical

Texfel 20 #1 (API 42-133-31419) is a plugged well in Eastland County, plugged November 21, 1980, last operated by Snow Oil CO..

The RRC has issued 2 drilling permits between 1978 and 1980, permitted to 3,611 ft.

Operator of record

Snow Oil Co.

Based in
Haltom City, TX
P-5 status
Inactive (I)
P-5 last filed
Aug 22, 1985
Permits on file
239
Phone
(817) 831-3535

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSnow Oil Co.Oct 30, 1980
3,611
total depth, ft
2
permits on file
Oct 30, 1980
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Nov 21, 1980

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
97635-99OtherSnow Oil Co.Oct 30, 1980Oct 30, 1980Nov 19, 1980270
22257-99DrillGregg, A. W.Apr 17, 1978Apr 17, 1978May 5, 19783,611

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13331419, documented in the API reference.