TEXAS · WELLS · EASTLAND COUNTY · DELAND, O. H. LEASE · API 42-133-32059 · DISTRICT 6E
Deland O. H. #20
Eastland County · Gailey-Allen (Marble Falls) field · Producing · Vertical
Deland O. H. #20 (API 42-133-32059) is a well in Eastland County operated by Stephens & Johnson Operating CO., completed December 17, 1979 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued November 2, 1979, permitted to 3,361 ft.
It was permitted by Texas Pacific Oil Company, Inc. and has since transferred to Stephens & Johnson Operating CO. on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Stephens & Johnson Operating Co.
Permitted by Texas Pacific Oil Company, Inc.; the EWA schedule now lists a different operator.
- Based in
- Wichita Falls, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jul 2, 2026
- Permits on file
- 360
- Phone
- (940) 723-2166
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stephens & Johnson Operating Co. |
| Production reports | Stephens & Johnson Operating Co.through Apr 2026 |
| Latest permit | Texas Pacific Oil Company, Inc.Nov 2, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,361
- total depth, ft
- 1
- permits on file
- Nov 2, 1979
- last permit issued
- Dec 17, 1979
- completed
- 0
- cumulative oil, bbl
- 277K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 17, 1979
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Deland, O. H. G-8-88829 | Gailey-Allen (Marble Falls) | Stephens & Johnson Operating Co. | 1 | 0 | 277K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 3,887 · prior 12 5,410(-28%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Oryx Energy CompanyJan 1993 → Jan 1993
- 2S & J Operating Co.Feb 1993 → Aug 1993
- 3Stephens & Johnson Operating Co.Sep 1993 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 62786-99 | Drill | Texas Pacific Oil Company, Inc. | Nov 2, 1979 | Nov 2, 1979 | — | 3,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 17, 1979 | Deland O. H. G-8-88829 | Gailey-Allen (Marble Falls) | Stephens & Johnson Operating Co. | Producing | 3,361 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,998 | 3,068 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 771 | 11 | 400 S |
| 2.625 | 2,962 | — | — |
| 5.5 | 3,361 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 4, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-32059 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-32059 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13332059, documented in the API reference.