TEXAS · WELLS · EASTLAND COUNTY · API 42-133-33441 · DISTRICT 6E

Davis B.A. #1

Y

Eastland County · North Ridge (Duffer) field · Producing  · Vertical

Davis B.A. #1 (API 42-133-33441) is a well in Eastland County operated by Braka Operating L.L.C., completed June 21, 1995 and listed as producing on the RRC schedule.

The RRC has issued 3 drilling permits between 1981 and 1995, permitted to 3,894 ft.

It was permitted by North Ridge Corporation and has since transferred to Braka Operating L.L.C. on the wellbore schedule.

Completion filings report 2 formation tops, including Marble Falls, Duffer.

No lease production has been reported under this well’s leases.

Operator of record

Braka Operating L.L.C.

Permitted by North Ridge Corporation; the EWA schedule now lists a different operator.

Based in
Ranger, TX
P-5 status
Active (A)
P-5 last filed
Feb 13, 2026
Permits on file
61
Phone
(254) 647-3358

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNorth Ridge Corporation
Production reportsBraka Operating, L.L.C.through Apr 2026
Latest permitNorth Ridge CorporationMay 3, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,894
total depth, ft
3
permits on file
May 3, 1995
last permit issued
Jun 21, 1995
completed
0
cumulative oil, bbl
127K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 21, 1995
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis, B.A. G-8-154041North Ridge (Duffer)Braka Operating, L.L.C.10111KOct 1994 – Jul 2026
Davis, B.A. G-8-146042Eastland County Regular (Gas)North Ridge Corporation1015.7KJun 1993 – Apr 1998
Davis,b.a. G-8-104112Ranger (Black Lime West)North Ridge Corporation10551Jan 1993 – Mar 1998

Gas, mcf lease total

Last 12 months 559 · prior 12 562(-1%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1North Ridge CorporationJan 1993 → Mar 2013
  2. 2Braka Operating, L.L.C.Apr 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
435350-99Field transferNorth Ridge CorporationMay 1, 1995May 3, 1995Jun 21, 19933,894
414145-99RecompletionNorth Ridge CorporationJul 22, 1993Jul 26, 1993Jun 21, 19933,894
139153-99DrillNorth Ridge CorporationNov 2, 1981Nov 2, 1981Nov 16, 19814,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 21, 1995Davis B.A. G-8-154041North Ridge (Duffer)Braka Operating L.L.C.Producing3,894
Jun 21, 1993Davis B.A. G-8-146042Eastland County Regular (Gas)North Ridge CorporationNot on Schedule—
Dec 3, 1981Davis B. A. O-8-18047Ranger (Black Lime West)North Ridge CorporationNot on Schedule—
Dec 3, 1981Davis B.A. G-8-104112Ranger (Black Lime West)North Ridge CorporationNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 1,543 ft elevation.Download CSV →

FormationMD ftSubsea
Marble Falls3,330-1,787
Duffer3,709-2,166

Perforations

Perforated and open-hole intervals.

FromToType
3,3303,350Perforated
3,7083,723Perforated
3,7093,724Perforated
3,7413,813Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251501190 S
8.62515012.2590 S
2.3753,360——
4.53,8947.875220 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 10, 2003Aug 4, 2003—
00Jun 20, 1995May 15, 1995—
00May 25, 1995——
00Nov 15, 1993Aug 4, 1993Yes
00Aug 11, 1993——
00Jan 12, 1984Mar 3, 1983—
00Jan 12, 1984Jan 20, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13333441, documented in the API reference.