TEXAS · WELLS · EASTLAND COUNTY · API 42-133-34789 · DISTRICT 6E

Robertson CSL #12

Plugged

Eastland County · Robertson(marble Falls Zone 5) field  · Vertical

Robertson Csl #12 (API 42-133-34789) is a plugged well in Eastland County, plugged September 18, 2017, last operated by Stephens & Johnson Operating CO..

The RRC has issued 3 drilling permits between 1983 and 2008, permitted to 3,900 ft.

Completion filings report 6 formation tops, including Strawn, Caddo, Smithwick, Big Saline.

Operator of record

Stephens & Johnson Operating Co.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
360
Phone
(940) 723-2166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Apr 2009
Latest permitStephens & Johnson Operating Co.May 6, 2008
3,900
total depth, ft
3
permits on file
May 6, 2008
last permit issued
Feb 25, 2008
completed
0
cumulative oil, bbl
2.64K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 25, 2008
Shut in
—
Plugged
Sep 18, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Robertson CSL G-8-135176WildcatStephens & Johnson Operating Co.100Jan 1993 – Sep 2017
Robertson CSL G-8-237572Robertson(marble Falls Zone 5)Stephens & Johnson Operating Co.102.64KFeb 2008 – Sep 2017
— G-8-105183——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stephens & Johnson Operating Co.Feb 2008 → Apr 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
657435-99RecompletionStephens & Johnson Operating Co.Mar 14, 2008May 6, 2008May 11, 19903,700
372875-99RecompletionOryx Energy CompanyMay 2, 1990May 2, 1990—3,700
189090-99DrillSun Exploration & Production Co.Mar 15, 1983Mar 15, 1983Mar 18, 19833,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 25, 2008Robertson CSL G-8-237572Robertson(marble Falls Zone 5)Stephens & Johnson Operating Co.Plugged—
May 22, 1990Robertson CSL G-8-135176WildcatStephens & Johnson Operating Co.Plugged—
Apr 20, 1983Robertson CSL G-8-105183Robertson(marble Falls Zone 5)Oryx Energy CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,341 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn2,163-822
Caddo2,579-1,238
Smithwick2,842-1,501
Big Saline3,156-1,815
Marble FallsMARBLE FALLS CON. ZN 53,403-2,062
Marble FallsMARBLE FALLS CONG. ZN 53,423-2,082
Duffer3,602-2,261

Perforations

Perforated and open-hole intervals.

FromToType
2,4822,490Perforated
3,4043,422Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62522612.25150 S
2.3753,343——
4.53,6998.5525 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 11, 2008Aug 4, 2008—
00Aug 4, 2008——
00Aug 9, 1990Jun 20, 1990—
00Aug 2, 1990——
00Jan 12, 1984May 2, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13334789, documented in the API reference.