WELL · 42-133-34877 · DISTRICT 7

Longmire #1

Plugged

Eastland County · Ranger (Black Lime West) field  · Vertical

Longmire #1 (API 42-133-34877) is a plugged well in Eastland County, plugged December 27, 2016, last operated by Ridge Oil Company.

The RRC has issued one drilling permit, issued April 25, 1983, permitted to 3,750 ft.

Completion filings report one formation top, including Lake Sand.

Its lease has reported 2.74K barrels of oil and 128K mcf of gas since January 1993, last reporting in July 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

Ridge Oil Company

Based in
Breckenridge, TX
P-5 status
Active (A)
P-5 last filed
Oct 14, 2025
Permits on file
477
Phone
(254) 559-2297

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRidge Oil Company
Production reportsEastland Operating, L.L.C.through Mar 2003
Latest permitRidge Oil CompanyApr 25, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,750
total depth, ft
1
permits on file
Apr 25, 1983
last permit issued
Sep 18, 1985
completed
2.74K
cumulative oil, bbl
128K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 18, 1985
Shut in
—
Plugged
Dec 27, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Earnest (Lake Sand) Unit O-8-24463Ranger (Black Lime West)Eastland Operating, L.L.C.102.74K128KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mustang Oil & Gas CorporationJan 1997 → Jun 1998
  2. 2Gruy Petroleum Management Co.Jul 1998 → Jan 1999
  3. 3R & B Energy Co.Feb 1999 → Nov 1999
  4. 4Eastland Operating, L.L.C.Dec 1999 → Mar 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
192362-99DrillRidge Oil CompanyApr 25, 1983Apr 25, 1983Apr 17, 19833,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-24463————

Formation tops

As filed on W-2/G-1. Subsea from 1,607 ft elevation.Download CSV →

FormationMD ftSubsea
Lake Sand3,410-1,803

Perforations

Perforated and open-hole intervals.

FromToType
3,4123,520Perforated
3,4143,418Perforated
3,4273,429Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62524112.25175 S
2.3753,550——
4.53,6267.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 1, 1987Oct 24, 1985—
00Aug 25, 1987——
00Dec 10, 1985Oct 24, 1985—
00Jan 12, 1984Jun 20, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
47.4K
bbl, all reported
Apr 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000058232H-1 InjectionPlugged Jan 19, 20171,0001,7003,412–3,432

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13334877, documented in the API reference.