TEXAS · WELLS · EASTLAND COUNTY · R.T.S. "A" LEASE · API 42-133-34881 · DISTRICT 6E

R.T.S. A #1

Plugged

Eastland County · Ranger (3550 Congl.) field  · Vertical

R.T.S. A #1 (API 42-133-34881) is a plugged well in Eastland County, plugged November 27, 2018, last operated by Eastland Operating L.L.C..

The RRC has issued one drilling permit, issued April 25, 1983, permitted to 3,700 ft.

It was permitted by Ridge Oil Company and has since transferred to Eastland Operating L.L.C. on the wellbore schedule.

Completion filings report 4 formation tops, including Caddo, Marble Falls, Conglomerate, Duffer.

Its lease has reported 66 barrels of oil and 49.6K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Eastland Operating L.L.C.

Permitted by Ridge Oil Company; the EWA schedule now lists a different operator.

Based in
Ranger, TX
P-5 status
Active (A)
P-5 last filed
Feb 11, 2026
Permits on file
3
Phone
(254) 647-5181

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEastland Operating L.L.C.
Production reportsEastland Operating, L.L.C.through Mar 2007
Latest permitRidge Oil CompanyApr 25, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,700
total depth, ft
1
permits on file
Apr 25, 1983
last permit issued
May 11, 1983
completed
66
cumulative oil, bbl
49.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2007

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 11, 1983
Shut in
—
Plugged
Nov 27, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
R.T.S. "A" G-8-113729Ranger (3550 Congl.)Eastland Operating, L.L.C.16649.6KJan 1993 – Mar 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mustang Oil & Gas CorporationJan 1993 → Jun 1998
  2. 2Gruy Petroleum Management Co.Jul 1998 → Jan 1999
  3. 3R & B Energy Co.Feb 1999 → Nov 1999
  4. 4Eastland Operating, L.L.C.Dec 1999 → Mar 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
192386-99DrillRidge Oil CompanyApr 25, 1983Apr 25, 1983Apr 29, 19833,700

Completions

CompletedLeaseFieldOperatorStatusDepth
May 11, 1983R. T. S. A O-8-19764Ranger (3550 Congl.)Ridge Oil CompanyPlugged—
May 11, 1983R.T.S. A G-8-113729Ranger (3550 Congl.)Eastland Operating L.L.C.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,508 ft elevation.Download CSV →

FormationMD ftSubsea
CaddoCADDO LS2,880-1,372
Marble FallsMARBLE FALLS LS3,206-1,698
Conglomerate3,550-2,042
DufferDUFFER LS3,600-2,092

Perforations

Perforated and open-hole intervals.

FromToType
3,5503,558Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522512.25150 S
2.3753,460——
4.53,6507.875120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 14, 1985Nov 20, 1984—
00Dec 13, 1984Nov 6, 1984—
00Jan 12, 1984May 16, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13334881, documented in the API reference.