TEXAS · WELLS · EASTLAND COUNTY · EARNEST (LAKE SAND) UNIT LEASE · API 42-133-35644 · DISTRICT 6E

Earnest (Lake Sand) Unit #2

Plugged

Eastland County · Ranger (Black Lime West) field  · Vertical

Earnest (Lake Sand) Unit #2 (API 42-133-35644) is a plugged well in Eastland County, plugged December 6, 2022, last operated by Eastland Operating L.L.C..

The RRC has issued one drilling permit, issued February 3, 1984, permitted to 3,900 ft.

It was permitted by Ridge Oil Company and has since transferred to Eastland Operating L.L.C. on the wellbore schedule.

Completion filings report 2 formation tops, including Caddo, Marble Falls.

Operator of record

Eastland Operating L.L.C.

Permitted by Ridge Oil Company; the EWA schedule now lists a different operator.

Based in
Ranger, TX
P-5 status
Active (A)
P-5 last filed
Feb 11, 2026
Permits on file
3
Phone
(254) 647-5181

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEastland Operating L.L.C.
Production reportsEastland Operating, L.L.C.through Apr 2015
Latest permitRidge Oil CompanyFeb 3, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,900
total depth, ft
1
permits on file
Feb 3, 1984
last permit issued
Mar 22, 1984
completed
0
cumulative oil, bbl
41.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 22, 1984
Shut in
—
Plugged
Dec 6, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Earnest (Lake Sand) Unit G-8-118742Ranger (Black Lime West)Eastland Operating, L.L.C.1041.9KJan 1993 – Dec 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mustang Oil & Gas CorporationJan 1993 → Jun 1998
  2. 2Gruy Petroleum Management Co.Jul 1998 → Jan 1999
  3. 3R & B Energy Co.Feb 1999 → Nov 1999
  4. 4Eastland Operating, L.L.C.Dec 1999 → Apr 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
228379-99DrillRidge Oil CompanyFeb 2, 1984Feb 3, 1984Mar 1, 19843,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 22, 1984Longmire O-8-19868Ranger (Black Lime West)Ridge Oil CompanyPlugged—
Mar 22, 1984Earnest (Lake Sand) Unit G-8-118742Ranger (Black Lime West)Eastland Operating L.L.C.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,608 ft elevation.Download CSV →

FormationMD ftSubsea
CaddoCADDO LS3,204-1,596
CaddoCADDO LS.3,204-1,596
Marble Falls3,500-1,892
Marble FallsMARBLE FALLS LS3,500-1,892

Perforations

Perforated and open-hole intervals.

FromToType
3,5003,520Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62525212.25180 S
4.53,6707.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 10, 1991Apr 24, 1991—
00Feb 4, 1986Jan 22, 1986—
00Nov 26, 1985Oct 30, 1985—
00Nov 19, 1985——
00Apr 23, 1984Apr 11, 1984—
00Apr 20, 1984Apr 11, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13335644, documented in the API reference.