TEXAS · WELLS · EASTLAND COUNTY · MORTON, R.O. LEASE · API 42-133-35742 · DISTRICT 6E
Morton R.O. #3
Eastland County · Reb (Marble Falls) field · Vertical
Morton R.O. #3 (API 42-133-35742) is a plugged well in Eastland County, plugged August 21, 1996, last operated by North Ridge Corporation.
The RRC has issued one drilling permit, issued March 13, 1984, permitted to 4,000 ft.
Completion filings report 2 formation tops, including Caddo, Marble Falls.
Its lease has reported 23 barrels of oil and 2.73K mcf of gas since January 1993, with no volume in the three years through April 2026.
Operator of record
- Based in
- Duncanville, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Aug 2, 2012
- Permits on file
- 377
- Phone
- (972) 296-1793
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | North Ridge Corporation |
| Production reports | North Ridge Corporationthrough Mar 1994 |
| Latest permit | North Ridge CorporationMar 13, 1984 |
- 4,000
- total depth, ft
- 1
- permits on file
- Mar 13, 1984
- last permit issued
- Apr 3, 1984
- completed
- 23
- cumulative oil, bbl
- 2.73K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 3, 1984
- Shut in
- —
- Plugged
- Aug 21, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Morton, R.O. G-8-122498 | Reb (Marble Falls) | North Ridge Corporation | 1 | 23 | 2.73K | Jan 1993 – Mar 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1North Ridge CorporationJan 1993 → Mar 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 232372-99 | Drill | North Ridge Corporation | Mar 12, 1984 | Mar 13, 1984 | Mar 18, 1984 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 3, 1984 | Morton R. O. O-8-20705 | Reb (Marble Falls) | North Ridge Corporation | Plugged | — |
| Apr 3, 1984 | Morton R.O. G-8-122498 | Reb (Marble Falls) | North Ridge Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,566 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 3,122 | -1,556 |
| Marble Falls | 3,432 | -1,866 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,434 | 3,458 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 259 | 11 | 150 S |
| 4.5 | 3,558 | 7.875 | 120 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 26, 1986 | Nov 3, 1986 | — |
| 00 | Nov 13, 1986 | — | — |
| 00 | Apr 23, 1984 | Apr 11, 1984 | — |
| 00 | Apr 20, 1984 | Apr 11, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-35742 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-35742 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13335742, documented in the API reference.