TEXAS · WELLS · EASTLAND COUNTY · WEBB LEASE · API 42-133-36679 · DISTRICT 6E

Webb #2

Shut in

Eastland County · Reb (Marble Falls) field · Temp Abandoned  · Vertical

Webb #2 (API 42-133-36679) is a well in Eastland County operated by Bacon Energy, completed November 5, 1985 and listed as temp abandoned on the RRC schedule, shut in June 1, 2025.

The RRC has issued one drilling permit, issued October 11, 1985, permitted to 3,650 ft.

It was permitted by Ridge Oil Company and has since transferred to Bacon Energy on the wellbore schedule.

Completion filings report one formation top, including Marble Falls.

Its lease has reported 6 barrels of oil and 232K mcf of gas since January 1993, last reporting volume in May 2025.

Operator of record

Bacon Energy

Permitted by Ridge Oil Company; the EWA schedule now lists a different operator.

Based in
Cisco, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 24, 2026
Phone
(254) 631-8105

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBacon Energy
Production reportsBacon Energythrough May 2025
Latest permitRidge Oil CompanyOct 11, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,650
total depth, ft
1
permits on file
Oct 11, 1985
last permit issued
Nov 5, 1985
completed
6
cumulative oil, bbl
232K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2025

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 5, 1985
Shut in
Jun 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Webb G-8-131133Reb (Marble Falls)Bacon Energy16232KJan 1993 – May 2025

Gas, mcf lease total

Last 12 months 197 · prior 12 1,209(-84%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ridge Oil CompanyJan 1993 → Feb 1997
  2. 2D & R EnterprisesMar 1997 → Oct 2020
  3. 3JD OperatingNov 2020 → Dec 2023
  4. 4Bacon EnergyMar 2024 → May 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
287470-99DrillRidge Oil CompanyOct 10, 1985Oct 11, 1985—3,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 5, 1985Webb G-8-131133Reb (Marble Falls)Bacon EnergyTemp Abandoned · shut in Jun 1, 20253,650
Nov 5, 1985Webb O-8-22339Reb (Marble Falls)Ridge Oil CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 1,481 ft elevation.Download CSV →

FormationMD ftSubsea
Marble FallsMARBLE FALLS LS.3,130-1,649

Perforations

Perforated and open-hole intervals.

FromToType
3,1323,156Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512512.2595 S
4.53,6437.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 20, 1989Jun 29, 1989—
00Jul 18, 1989——
00Dec 2, 1985Nov 14, 1985Yes
00Nov 22, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13336679, documented in the API reference.