TEXAS · WELLS · EASTLAND COUNTY · G-8-125621 LEASE · API 42-133-37019 · DISTRICT 6E

Stark #1

Plugged

Eastland County · Lee Ray (Duffer Lime) field  · Vertical

Stark #1 (API 42-133-37019) is a plugged well in Eastland County, plugged February 9, 1990, last operated by Smith Pipe Of Abilene.

The RRC has issued one drilling permit, issued January 7, 1987, permitted to 4,000 ft.

It was permitted by Expanding Energy Corporation and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.

Completion filings report 4 formation tops, including Caddo, Lake Sand, Bond Sand, Duffer.

Operator of record

Smith Pipe of Abilene

Permitted by Expanding Energy Corporation; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Aug 29, 2014
Phone
(325) 692-3903

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSmith Pipe of Abilene
Production reportsnone
Latest permitExpanding Energy CorporationJan 7, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
Jan 7, 1987
last permit issued
Oct 15, 1987
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 15, 1987
Shut in
—
Plugged
Feb 9, 1990

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-8-125621——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
325169-99DrillExpanding Energy CorporationJan 7, 1987Jan 7, 1987—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 15, 1987Stark G-8-125621Lee Ray (Duffer Lime)Smith Pipe of AbilenePlugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,519 ft elevation.Download CSV →

FormationMD ftSubsea
CaddoCADDO LIME3,462-1,943
Lake Sand3,636-2,117
Bond Sand3,704-2,185
DufferDUFFER LIME3,871-2,352

Perforations

Perforated and open-hole intervals.

FromToType
3,8783,890Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62517012.25110 S
4.53,9407.875235 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 10, 1987Nov 5, 1987Yes
00Dec 4, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13337019, documented in the API reference.