TEXAS · WELLS · EASTLAND COUNTY · SNELSON LEASE · API 42-133-37742 · DISTRICT 6E

Snelson #5

Plugged

Eastland County · Eastland County Regular (Gas) field  · Vertical

Snelson #5 (API 42-133-37742) is a plugged well in Eastland County, plugged March 29, 2002, last operated by JD Production CO.

The RRC has issued one drilling permit, issued July 22, 1997, permitted to 1,000 ft.

Its lease has reported 2.56K mcf of gas since July 1997, with no volume in the three years through August 2026.

Operator of record

JD Production Co

Based in
Waco, TX
P-5 status
Inactive (I)RRC P-5 file of Oct 22, 2026
P-5 last filed
Jul 16, 1997
Permits on file
9
Phone
(817) 848-9671

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJD Production Co
Production reportsJD Production Cothrough Dec 1997
Latest permitJD Production CoJul 22, 1997
1,000
total depth, ft
1
permits on file
Jul 22, 1997
last permit issued
Jul 31, 1997
completed
0
cumulative oil, bbl
2.56K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · OCT 1997 THROUGH DEC 1997

On this pageLease production

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 31, 1997
Shut in
—
Plugged
Mar 29, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Snelson G-8-164936Eastland County Regular (Gas)JD Production Co102.56KJul 1997 – Dec 1997

No volumes reported on these leases in the last three years.

Wells named Snelson

JD Production Co's other wells filed under this lease name in Eastland County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Operator on the lease's P-4

Each operator named on the P-4 filings for this well's lease (a gas well is its own lease), from the date its filing took effect. The P-4 is filed by lease, so a date before the well was drilled is the lease's.

OperatorFromTo
JD Production CoNov 14, 1997today

Reporting production

Every operator that reported production on this well's lease, in order.

  1. 1JD Production CoOct 1997 → Dec 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
465216-99DrillJD Production CoJul 22, 1997Jul 22, 1997Jul 22, 19971,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 31, 1997Snelson G-8-164936Eastland County Regular (Gas)JD Production CoPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
515525Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.55406.75270 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 3, 1997Oct 20, 1997Yes
00Oct 29, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13337742, documented in the API reference.