WELL · 42-133-38252 · DISTRICT 7
Simpson #1
Eastland County · Wildcat field · Vertical
Simpson #1 (API 42-133-38252) is a well in Eastland County operated by Interstate Explorations LLC, completed December 5, 2016.
The RRC has issued one drilling permit (amended once), issued November 3, 2016, permitted to 5,000 ft.
Completion filings report 9 formation tops, including Strawn, Blake - Disposal, Canyon, Cisco.
Its 2 leases have reported 354 barrels of oil since December 2016, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Feb 4, 2026 · 129 permits on file · (254) 442-1057
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Interstate Explorations LLC |
| Production reports | Interstate Explorations LLCthrough Jun 2024 |
| Latest permit | Interstate Explorations LLCNov 3, 2016 |
- 5,000
- total depth, ft
- 2
- permits on file
- Nov 3, 2016
- last permit issued
- Dec 5, 2016
- completed
- 354
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2016 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 5, 2016
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Simpson O-8-32738 | JO Kiel (Caddo) | Interstate Explorations LLC | 1 | 354 | 0 | Dec 2023 – Jul 2026 |
| Simpson O-8-32143 | Wildcat | Interstate Explorations LLC | 1 | 0 | 0 | Dec 2016 – Mar 2024 |
Oil, barrels lease total
Last 12 months 0 · prior 12 73(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Interstate Explorations LLCDec 2023 → Jun 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 819885-98 | Drill | Interstate Explorations LLC | Nov 29, 2016 | Nov 3, 2016 | Nov 21, 2016 | 5,000 |
| 819885-99 | Drill | Interstate Explorations LLC | Oct 28, 2016 | Nov 3, 2016 | Nov 21, 2016 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-32143 | — | — | — | — |
| — | — O-8-32738 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,776 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,958 | 2,966 | Perforated |
| 2,990 | 3,000 | Perforated |
| 3,042 | 3,056 | Perforated |
| 3,072 | 3,080 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 240 | 12.25 | 130 S |
| 4.5 | 4,251 | 7.875 | 360 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 14, 2024 | Feb 7, 2024 | — |
| 00 | Jul 13, 2017 | Jul 7, 2017 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-38252 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-38252 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13338252, documented in the API reference.