TEXAS · WELLS · ECTOR COUNTY · API 42-135-00477 · DISTRICT 7B

Goldsmith C. A. et Al #62

Shut in

Ector County · Goldsmith (Grayburg) field · Temp Abandoned  · Horizontal

Goldsmith C. A. ET AL #62 (API 42-135-00477) is a horizontal well in Ector County operated by Hilcorp Energy Company, completed February 25, 1998 and listed as temp abandoned on the RRC schedule, shut in May 1, 2004.

The RRC has issued one drilling permit, issued August 7, 1997, permitted to 4,707 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report one formation top, including Grayburg.

Its 2 leases have reported 14.8M barrels of oil and 20.5M mcf of gas since January 1993, last reporting in July 2026. The leases carry 722 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitChevron U. S. A. Inc.Aug 7, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,707
total depth, ft
1
permits on file
Aug 7, 1997
last permit issued
Feb 25, 1998
completed
14.8M
cumulative oil, bbl
20.5M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 25, 1998
Shut in
May 1, 2004
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 722 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldsmith, C. A. et Al G-10-168902Goldsmith (Grayburg)Hilcorp Energy Company1089.4KFeb 1998 – Jul 2026
Goldsmith San Andres Unit O-10-2020GoldsmithHilcorp Energy Company72114.8M20.4MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 147,773 · prior 12 107,674(+37%)

010K20K202420252026

Gas, mcf lease total

Last 12 months 481,583 · prior 12 198,231(+143%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
  2. 2XTO Energy Inc.Aug 2004 → Mar 2025
  3. 3Hilcorp Energy CompanyApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
465851-99RecompletionChevron U. S. A. Inc.Aug 5, 1997Aug 7, 1997Oct 6, 19975,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 25, 1998Goldsmith C. A. et Al G-10-168902Goldsmith (Grayburg)Hilcorp Energy CompanyTemp Abandoned · shut in May 1, 20044,707
—Goldsmith San Andres Unit O-10-2020GoldsmithHilcorp Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 3,127 ft elevation.Download CSV →

FormationMD ftSubsea
Grayburg4,152-1,025

Perforations

Perforated and open-hole intervals.

FromToType
4,1324,205Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62522412.5100 S
74,1328.75225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 19, 1998Apr 20, 1998Yes
00Jul 23, 1998——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13500477, documented in the API reference.