TEXAS · WELLS · ECTOR COUNTY · API 42-135-00938 · DISTRICT 7B
Goldsmith C. A. Etal #559R
Ector County · Goldsmith (5600) field · Vertical
Goldsmith C. A. Etal #559R (API 42-135-00938) is a plugged well in Ector County, plugged November 4, 1988, last operated by Xto Energy Inc..
The RRC has issued one drilling permit, issued September 5, 2014, permitted to 5,760 ft.
Completion filings report one formation top, including 5600.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | XTO Energy Inc.Sep 5, 2014 |
- 5,760
- total depth, ft
- 1
- permits on file
- Sep 5, 2014
- last permit issued
- Oct 11, 1968
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 11, 1968
- Shut in
- —
- Plugged
- Nov 4, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 792955-99 | Reenter | XTO Energy Inc. | Jul 30, 2014 | Sep 5, 2014 | — | 5,760 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 11, 1968 | Goldsmith C. A. Etal O-10-2290 | Goldsmith (5600) | XTO Energy Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,155 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 5600 | 5,400 | -2,245 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,400 | 5,760 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,475 | 12.25 | 700 S |
| 7 | 5,400 | 8.75 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 21, 1988 | Mar 29, 1988 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-00938 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-00938 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 173K
- bbl, all reported
- Feb 2022
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000014538 | H-1 Injection | Plugged Nov 22, 1988 | 500 | 1,120 | 5,400–5,760 |
| 000110789 | H-1 Injection | Canceled Jun 23, 2022 | 2,000 | 2,000 | 4,969–7,867 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13500938, documented in the API reference.