TEXAS · WELLS · ECTOR COUNTY · GOLDSMITH, C. A., ETAL LEASE · API 42-135-00983 · DISTRICT 7B

Goldsmith C. A. Etal #605

Plugged

Ector County · Goldsmith (5600) field  · Vertical

Goldsmith C. A. Etal #605 (API 42-135-00983) is a plugged well in Ector County, plugged January 4, 1999, last operated by Xto Energy Inc..

The RRC has issued one drilling permit, issued May 11, 1987, permitted to 5,805 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report one formation top, including 5600.

Its lease has reported 8.37M barrels of oil and 9.94M mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 699 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Sep 2006
Latest permitChevron U. S. A. Inc.May 11, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,805
total depth, ft
1
permits on file
May 11, 1987
last permit issued
Feb 1, 1965
completed
8.37M
cumulative oil, bbl
9.94M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2006

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 1, 1965
Shut in
—
Plugged
Jan 4, 1999

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 699 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldsmith, C. A., Etal O-10-2290Goldsmith (5600)XTO Energy Inc.6998.37M9.94MJan 1993 – Sep 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
  2. 2XTO Energy Inc.Aug 2004 → Sep 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
330064-99RecompletionChevron U. S. A. Inc.May 11, 1987May 11, 1987—5,805

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 1, 1965Goldsmith C. A. Etal O-10-2290Goldsmith (5600)XTO Energy Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 3,224 ft elevation.Download CSV →

FormationMD ftSubsea
5600——

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,58812.25800 S
75,6248.75700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 21, 1988Mar 29, 1988—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Sep 1998
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000014562UIC PermitPlugged Jan 7, 19995001,0005,624–5,805

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119971998

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13500983, documented in the API reference.