TEXAS · WELLS · ECTOR COUNTY · API 42-135-01041 · DISTRICT 7B
Goldsmith C. A. Etal #663
Ector County · Goldsmith (Clear Fork) field · Shut In · Vertical
Goldsmith C. A. Etal #663 (API 42-135-01041) is a well in Ector County operated by Hilcorp Energy Company, completed June 21, 2010 and listed as shut in on the RRC schedule, shut in May 1, 2008.
The RRC has issued one drilling permit, issued May 12, 2000, permitted to 5,850 ft.
It was permitted by Chevron U. S. A. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 2 formation tops, including Anhydrite, Anhydrite & Lime.
Its 3 leases have reported 41.7M barrels of oil and 73.4M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 2,304 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,458
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Chevron U. S. A. Inc.May 12, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,850
- total depth, ft
- 1
- permits on file
- May 12, 2000
- last permit issued
- Jun 21, 2010
- completed
- 41.7M
- cumulative oil, bbl
- 73.4M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 21, 2010
- Shut in
- May 1, 2008
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2,304 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Goldsmith San Andres Unit O-10-2020 | Goldsmith | Hilcorp Energy Company | 721 | 14.8M | 20.4M | Jan 1993 – Apr 2026 |
| Goldsmith, C. A., Etal O-10-2100 | Goldsmith (Clear Fork) | Hilcorp Energy Company | 884 | 18.5M | 43.1M | Jan 1993 – Apr 2026 |
| Goldsmith, C. A., Etal O-10-2290 | Goldsmith (5600) | XTO Energy Inc. | 699 | 8.37M | 9.94M | Jan 1993 – Sep 2006 |
Oil, barrels lease total
Last 12 months 393,598 · prior 12 321,214(+23%)
Gas, mcf lease total
Last 12 months 881,375 · prior 12 450,470(+96%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
- 2XTO Energy Inc.Aug 2004 → Mar 2025
- 3Hilcorp Energy CompanyApr 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 494965-99 | Recompletion | Chevron U. S. A. Inc. | May 11, 2000 | May 12, 2000 | Jun 20, 2000 | 5,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 21, 2010 | Goldsmith C. A. Etal O-10-2100 | Goldsmith (Clear Fork) | Hilcorp Energy Company | Shut In · shut in May 1, 2008 | 5,850 |
| Jan 6, 1973 | Goldsmith San Andres Unit O-10-2020 | Goldsmith | Hilcorp Energy Company | Shut In · shut in Nov 1, 2000 | 5,850 |
| Jul 10, 2000 | Goldsmith C. A. Etal O-10-2290 | Goldsmith (5600) | XTO Energy Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,168 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anhydrite | 1,535 | 1,633 |
| Anhydrite & Lime | 3,904 | -736 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,241 | 4,278 | Perforated |
| 5,500 | 5,850 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,531 | 13.75 | 1,015 S |
| 7 | 5,500 | 8.75 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 24, 2010 | Jun 28, 2010 | — |
| 00 | Jan 31, 2007 | May 23, 2001 | Yes |
| 00 | Aug 22, 2002 | May 23, 2001 | Yes |
| 00 | Jul 30, 2002 | — | — |
| 00 | Jan 12, 1984 | Jan 26, 1973 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-01041 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-01041 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13501041, documented in the API reference.