TEXAS · WELLS · ECTOR COUNTY · API 42-135-01117 · DISTRICT 7B

Goldsmith San Andres Unit #740RW

Plugged

Ector County · Goldsmith field  · Vertical

Goldsmith San Andres Unit #740RW (API 42-135-01117) is a plugged well in Ector County, plugged December 19, 2001, last operated by Hilcorp Energy Company.

The RRC has issued 2 drilling permits between 1996 and 2014, permitted to 6,900 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Its 2 leases have reported 23.2M barrels of oil and 30.4M mcf of gas since January 1993, last reporting in July 2026. The leases carry 1,420 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Feb 6, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,900
total depth, ft
2
permits on file
Feb 6, 2014
last permit issued
Jul 19, 1996
completed
23.2M
cumulative oil, bbl
30.4M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 19, 1996
Shut in
—
Plugged
Dec 19, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 1,420 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldsmith San Andres Unit O-10-2020GoldsmithHilcorp Energy Company72114.8M20.4MJan 1993 – Jul 2026
Goldsmith, C. A., Etal O-10-2290Goldsmith (5600)XTO Energy Inc.6998.37M9.94MJan 1993 – Jan 2007

Oil, barrels lease total

Last 12 months 147,773 · prior 12 107,674(+37%)

010K20K202420252026

Gas, mcf lease total

Last 12 months 481,583 · prior 12 198,231(+143%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
  2. 2XTO Energy Inc.Aug 2004 → Mar 2025
  3. 3Hilcorp Energy CompanyApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
777358-99ReenterXTO Energy Inc.Jan 15, 2014Feb 6, 2014—6,900
447932-99RecompletionChevron U. S. A. Inc.May 8, 1996May 10, 1996Jun 3, 19965,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 19, 1996Goldsmith San Andres Unit O-10-2020GoldsmithHilcorp Energy CompanyPlugged—
—Goldsmith C. A. Etal O-10-2290Goldsmith (5600)XTO Energy Inc.Plugged—

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,53911700 S
5.55,5097.875700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 27, 1996Aug 6, 1996Yes
00Nov 13, 1996——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Feb 2017
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000110119H-1 InjectionCanceled Jul 26, 20172,0002,0004,969–7,867

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120162017

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13501117, documented in the API reference.