WELL · 42-135-01375 · DISTRICT 8

Connell W. E. NCT-2 #143

Shut in

Ector County · Jordan (Connell Sand) field · Shut IN  · Vertical

Connell W. E. Nct-2 #143 (API 42-135-01375) is a well in Ector County operated by Ctoc Energy LLC, completed February 24, 1997 and listed as shut in on the RRC schedule, shut in October 1, 1999.

The RRC has issued one drilling permit (amended once), issued December 10, 1996, permitted to 9,050 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Ctoc Energy LLC on the wellbore schedule.

Completion filings report one formation top, including Ellenburger.

Its 2 leases have reported 32.5K barrels of oil and 24.7K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Ctoc Energy LLC

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 24, 2026
Phone
(817) 334-7804

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexaco E & P Inc.
Production reportsTexaco E & P Inc.through Jul 1999
Latest permitTexaco E & P Inc.Dec 10, 1996
9,050
total depth, ft
2
permits on file
Dec 10, 1996
last permit issued
Feb 24, 1997
completed
32.5K
cumulative oil, bbl
24.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 24, 1997
Shut in
Oct 1, 1999
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Connell, W. E., NCT-2 O-10-35192Jordan (Connell Sand)Cross Timbers Energy, LLC232.5K24.7KOct 1996 – Jul 2026
Connell, W. E., NCT-2 O-10-16599Metz, East (Ellenburger)Texaco E & P Inc.200Jan 1993 – Apr 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Oct 1996 → Jul 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
455038-98RecompletionTexaco E & P Inc.Jan 29, 1997Dec 10, 1996Jan 15, 19979,050
455038-99RecompletionTexaco E & P Inc.Nov 12, 1996Dec 10, 1996—9,050

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 24, 1997Connell W. E. NCT-2 O-10-35192Jordan (Connell Sand)Ctoc Energy LLCShut IN · shut in Oct 1, 19999,050
Nov 23, 1983Connell W. E. NCT-2 O-10-16599Metz East (Ellenburger)Texaco E & P Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,862 ft elevation.Download CSV →

FormationMD ftSubsea
Ellenburger8,984-6,122

Perforations

Perforated and open-hole intervals.

FromToType
8,8828,910Perforated
8,9849,000Perforated
9,0029,012Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.62521817.5250 S
13.37521817.5250 S
13.375218——
9.6253,42212.51,600 S
8.6253,4229.51,600 S
8.6253,422——
2.8759,0327.8751,150 S
2.8759,032——
2.8759,050——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 19, 1997Mar 24, 1997Yes
00Apr 30, 1997Feb 13, 1984—
00Mar 13, 1984Feb 13, 1984—
00Jan 12, 1984Feb 13, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13501375, documented in the API reference.