TEXAS · WELLS · ECTOR COUNTY · TXL NORTH UNIT LEASE · API 42-135-05909 · DISTRICT 7B

TXL North Unit #544W

Y

Ector County · TXL (Tubb) field · Injection  · Vertical

Txl North Unit #544W (API 42-135-05909) is a well in Ector County operated by Formentera Operations LLC, completed January 14, 1991 and listed as injection on the RRC schedule.

The RRC has issued 2 drilling permits between 1977 and 1980, permitted to 8,074 ft.

It was permitted by Shell Oil Company and has since transferred to Formentera Operations LLC on the wellbore schedule.

Completion filings report one formation top, including San Andres.

Its lease has reported 13.9M barrels of oil and 40.3M mcf of gas since January 1993, last reporting in July 2026. The lease carries 496 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 62.4K barrels injected in the 12 months reported through October 2025.

Operator of record

Formentera Operations LLC

Permitted by Shell Oil Company; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 11, 2026
Permits on file
90
Phone
(512) 514-5779

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFormentera Operations LLC
Production reportsFormentera Operations LLCthrough Apr 2026
Latest permitShell Oil CompanyJan 22, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,074
total depth, ft
2
permits on file
Jan 22, 1980
last permit issued
Jan 14, 1991
completed
13.9M
cumulative oil, bbl
40.3M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 14, 1991
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 496 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
TXL North Unit O-10-20487TXL (Tubb)Formentera Operations LLC49613.9M40.3MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 91,054 · prior 12 102,642(-11%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 257,591 · prior 12 276,773(-7%)

010K20K30K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&P Inc.Jan 1993 → Nov 1995
  2. 2Anadarko Petroleum CorporationDec 1995 → Mar 2007
  3. 3Apache CorporationApr 2007 → Jun 2021
  4. 4Slant Operating, LLCJul 2021 → Oct 2023
  5. 5Formentera Operations LLCNov 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
70478-99RecompletionShell Oil CompanyJan 22, 1980Jan 22, 1980—8,074
12615-99RecompletionShell Oil CompanyNov 22, 1977Nov 22, 1977—8,074

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 14, 1991TXL North Unit O-10-20487TXL (Tubb)Formentera Operations LLCInjection8,074
—TXL North Unit O-10-20487TXL (Tubb)Formentera Operations LLCNot on Schedule—
—TXL -K- Tract 1 O-10-23991TXL (San Andres)Anadarko Petroleum CorporationNot on Schedule—
—TXL -K- Tract 1 O-10-12173TXL (Devonian)Anadarko Petroleum CorporationNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 3,286 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,100-814

Perforations

Perforated and open-hole intervals.

FromToType
5,4036,324Perforated
5,4836,106Perforated
—6,158Perforated
—8,050Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,42012.25500 S
9.6251,420—500 S
2.3755,384——
78,061—900 S
78,0748.75900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 27, 1992Feb 28, 1992—
00Feb 13, 1991Oct 1, 1990—
00Jan 12, 1984Jan 28, 1980—
00Jan 12, 1984Dec 9, 1960—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

62.4K
bbl, last 12 reported months
4.52M
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000020221H-1 InjectionActive3,0002,0005,300–7,100

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 62,409 · prior 12 11,435(+446%)

05K10K15K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13505909, documented in the API reference.