TEXAS · WELLS · ECTOR COUNTY · API 42-135-05970 · DISTRICT 7B

TXL -E- #1

Plugged

Ector County · TXL (Central Waddell) field  · Vertical

Txl -E- #1 (API 42-135-05970) is a plugged well in Ector County, plugged May 16, 2016, last operated by Apache Corporation.

The RRC has issued one drilling permit, issued June 24, 1997, permitted to 9,837 ft.

It was permitted by Anadarko Petroleum Corp. and has since transferred to Apache Corporation on the wellbore schedule.

Its 3 leases have reported 10.8K barrels of oil and 84.8K mcf of gas since January 1993, last reporting in May 2016. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Apache Corporation

Permitted by Anadarko Petroleum Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,756
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko Petroleum Corporation
Production reportsApache Corporationthrough Aug 2009
Latest permitAnadarko Petroleum Corp.Jun 24, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,837
total depth, ft
1
permits on file
Jun 24, 1997
last permit issued
Nov 9, 2010
completed
10.8K
cumulative oil, bbl
84.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 9, 2010
Shut in
—
Plugged
May 16, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
TXL -E- O-10-35811TXL (Central Waddell)Apache Corporation110K64.6KDec 1997 – May 2016
TXL -E- O-10-6987TXL (Ellenburger)Apache Corporation3017KJan 1993 – Dec 2009
TXL -E- O-10-16284TXL (Wolfcamp, North)Anadarko Petroleum Corporation17233.22KJan 1993 – Mar 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko Petroleum CorporationAug 1997 → Mar 2007
  2. 2Apache CorporationApr 2007 → Feb 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
464050-99RecompletionAnadarko Petroleum Corp.Jun 20, 1997Jun 24, 1997Jul 30, 19979,837

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 9, 2010TXL -E- O-10-35811TXL (Central Waddell)Apache CorporationPlugged—
—TXL -E- O-10-16284TXL (Wolfcamp North)Anadarko Petroleum CorporationPlugged—
—TXL -E- O-10-6987TXL (Ellenburger)Apache CorporationPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
9,1038,252Perforated
9,3899,456Perforated
—7,764Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37524117.25300 S
13.37524117.5300 S
13.375241—300 S
8.6253,631—1,600 S
8.6253,631113,200 S
8.6253,63112.253,200 S
2.3757,822——
5.59,6157.8751,000 S
5.59,615—1,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 6, 2011Nov 15, 2010—
00Aug 12, 1998Jun 19, 1998—
00Jul 31, 1998——
00Jan 12, 1984Nov 10, 1969—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13505970, documented in the API reference.