TEXAS · WELLS · ECTOR COUNTY · API 42-135-06344 · DISTRICT 7B

Goldsmith-Blakeney/S. A./Unit #201

Y

Ector County · Goldsmith East (Grayburg) field · Producing  · Vertical

Goldsmith-Blakeney/S. A./Unit #201 (API 42-135-06344) is a well in Ector County operated by Occidental Permian Ltd., completed July 23, 1993 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued January 31, 1994, permitted to 6,235 ft.

It was permitted by Amoco Production Company and has since transferred to Occidental Permian Ltd. on the wellbore schedule.

Its 2 leases have reported 276K barrels of oil and 1.36M mcf of gas since January 1993, last reporting in July 2026. The leases carry 46 wells, so these are lease totals, not this well alone.

Operator of record

Occidental Permian Ltd.

Permitted by Amoco Production Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 2, 2026
Permits on file
6,251
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOccidental Permian Ltd.
Production reportsOccidental Permian Ltd.through Apr 2026
Latest permitAmoco Production CompanyJan 31, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,235
total depth, ft
2
permits on file
Jan 31, 1994
last permit issued
Jul 23, 1993
completed
276K
cumulative oil, bbl
1.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 23, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 46 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldsmith-Blakeney/S. A./Unit G-10-152978Goldsmith, East (Grayburg)Occidental Permian Ltd.10910KJul 1993 – Jul 2026
Goldsmith-Blakeney /S.A./ Unit O-10-17736GoldsmithOccidental Permian Ltd.45276K450KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 6,543 · prior 12 10,585(-38%)

02K4K6K202420252026

Oil, barrels lease total

Last 12 months 1,490 · prior 12 1,187(+26%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyJan 1993 → Feb 1997
  2. 2Altura Energy Ltd.Mar 1997 → Apr 2000
  3. 3Occidental Permian Ltd.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
420648-98RecompletionAmoco Production CompanyFeb 3, 1994Jan 31, 1994Jul 9, 19936,235
420648-99RecompletionAmoco Production CompanyJan 31, 1994Jan 31, 1994—6,235

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 23, 1993Goldsmith-Blakeney/S. A./Unit G-10-152978Goldsmith East (Grayburg)Occidental Permian Ltd.Producing6,235
Oct 8, 1963Goldsmith-Blakeney /S.A./ Unit O-10-17736GoldsmithOccidental Permian Ltd.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
3,7833,918Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.75150—110 S
74,125—250 S
74,126—250 S
56,095—400 S
26,166——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 22, 1995Jan 6, 1995Yes
00Mar 6, 1995——
00Jan 12, 1984Nov 5, 1963—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13506344, documented in the API reference.