WELL · 42-135-06964 · DISTRICT 8

Thomas B #6

Plugged

Ector County · TXL (Tubb) field  · Vertical

Thomas B #6 (API 42-135-06964) is a plugged well in Ector County, plugged December 30, 2003, last operated by Oxy USA Wtp LP.

The RRC has issued one drilling permit, issued July 11, 1995, permitted to 8,180 ft.

It was permitted by Oxy USA Inc. and has since transferred to Oxy USA Wtp LP on the wellbore schedule.

Completion filings report 4 formation tops, including San Andres, Clear Fork, Tubb, Wolfcamp.

Its 2 leases have reported 20.5K barrels of oil and 29.4K mcf of gas since January 1993, last reporting in November 2011. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

OXY USA WTP LP

Permitted by OXY USA Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Permits on file
2,289
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA WTP LP
Production reportsOXY USA WTP LPthrough Dec 2003
Latest permitOXY USA Inc.Jul 11, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,180
total depth, ft
1
permits on file
Jul 11, 1995
last permit issued
Jun 24, 1995
completed
20.5K
cumulative oil, bbl
29.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 24, 1995
Shut in
—
Plugged
Dec 30, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thomas B O-10-34547TXL (Tubb)OXY USA WTP LP220.5K29.4KJun 1995 – Nov 2011
TXL Devonian Main Pay Unit G-10-60848TXL (Devonian-Main Pay)Shell Western E&P Inc.100Jan 1993 – Jul 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1OXY USA Inc.Jul 1995 → Dec 2000
  2. 2OXY USA WTP LPJan 2001 → Apr 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
437728-99RecompletionOXY USA Inc.Jul 11, 1995Jul 11, 1995May 25, 19958,180

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 24, 1995Thomas B O-10-34547TXL (Tubb)OXY USA WTP LPPlugged—
Sep 11, 1989TXL Devonian Main Pay Unit G-10-60848TXL (Devonian-Main Pay)Shell Western E&P Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 3,341 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,263-922
Clear ForkCLEARFORK5,720-2,379
Tubb6,214-2,873
Wolfcamp7,646-4,305

Perforations

Perforated and open-hole intervals.

FromToType
6,0276,401Perforated
8,0308,180Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37522417.25250 S
13.375224—250 S
8.6253,85311750 S
8.6253,853—750 S
5.58,0307.875350 S
2.8758,175——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 2, 1995Jul 24, 1995Yes
00Aug 11, 1995——
00May 1, 1990Apr 16, 1990—
00Jan 12, 1984Feb 5, 1975—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13506964, documented in the API reference.