TEXAS · WELLS · ECTOR COUNTY · API 42-135-07039 · DISTRICT 7B
Thomas H Tract 1 #1
Ector County · TXL (Wolfcamp North) field · Shut In · Vertical
Thomas H Tract 1 #1 (API 42-135-07039) is a well in Ector County operated by Formentera Operations LLC, completed April 13, 2009 and listed as shut in on the RRC schedule, shut in November 1, 2011.
The RRC has issued 2 drilling permits between 1997 and 2009, permitted to 9,800 ft.
It was permitted by Apache Corporation and has since transferred to Formentera Operations LLC on the wellbore schedule.
Its 2 leases have reported 13.3K barrels of oil and 62K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Apache Corporation; the EWA schedule now lists a different operator.
- Based in
- Austin, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jun 11, 2026
- Permits on file
- 90
- Phone
- (512) 514-5779
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Formentera Operations LLC |
| Production reports | Apache Corporationthrough May 2013 |
| Latest permit | Apache CorporationMay 26, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,800
- total depth, ft
- 2
- permits on file
- May 26, 2009
- last permit issued
- Apr 13, 2009
- completed
- 13.3K
- cumulative oil, bbl
- 62K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 13, 2009
- Shut in
- Nov 1, 2011
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Thomas "H" Tract 1 O-10-39679 | TXL (Wolfcamp, North) | Formentera Operations LLC | 1 | 174 | 20K | Apr 2009 – Jul 2026 |
| Thomas "H" Tract I O-10-24699 | TXL (Devonian) | Apache Corporation | 1 | 13.1K | 42K | Jan 1993 – May 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Shell Western E&P Inc.Jan 1993 → Nov 1995
- 2Anadarko Petroleum CorporationJan 1996 → Sep 1997
- 3Apache CorporationMay 2007 → Aug 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 681455-99 | Recompletion | Apache Corporation | May 21, 2009 | May 26, 2009 | Feb 3, 2009 | 9,800 |
| 463401-99 | Recompletion | Anadarko Petroleum Corp. | Jun 5, 1997 | Jun 10, 1997 | Jan 12, 1998 | 9,793 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 13, 2009 | Thomas H Tract 1 O-10-39679 | TXL (Wolfcamp North) | Formentera Operations LLC | Shut In · shut in Nov 1, 2011 | 9,800 |
| Apr 13, 2009 | Thomas H Tract I O-10-24699 | TXL (Devonian) | Apache Corporation | Not on Schedule | — |
| — | — O-10-16278 | TXL North (Waddell) | Shell Oil Company | Not on Schedule | — |
| — | Thomas -H- Tract 1 O-10-22509 | TXL (Silurian) | Shell Oil Company | Not on Schedule | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,611 | 7,730 | Perforated |
| 7,611 | 7,958 | Perforated |
| 7,663 | 7,730 | Perforated |
| 7,845 | 7,958 | Perforated |
| 8,474 | 8,497 | Perforated |
| 9,386 | 9,471 | Perforated |
| 9,386 | 9,474 | Perforated |
| 9,692 | 9,800 | Open hole |
| — | 8,465 | Perforated |
| — | 8,497 | Perforated |
| — | 9,386 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.625 | 219 | — | 300 S |
| 13.375 | 219 | 17.5 | 300 S |
| 13.375 | 219 | — | 300 S |
| 8.625 | 3,602 | 11 | 3,000 S |
| 8.625 | 3,602 | — | 3,000 S |
| 5.5 | 9,692 | 7.875 | 1,000 S |
| 5.5 | 9,692 | — | 1,000 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 22, 2010 | Aug 19, 2009 | Yes |
| 00 | Jan 12, 2010 | — | — |
| 00 | Sep 10, 2009 | Apr 27, 2009 | Yes |
| 00 | Oct 6, 1999 | Aug 12, 1999 | — |
| 00 | Jan 12, 1984 | Sep 27, 1977 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-07039 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-07039 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13507039, documented in the API reference.