WELL · 42-135-10049 · DISTRICT 8
Moss E #1
Ector County · Harper (Strawn) field · Vertical
Moss E #1 (API 42-135-10049) is a plugged well in Ector County, plugged July 18, 2022, last operated by Hilcorp Energy Company.
The RRC has issued one drilling permit, issued August 16, 1999, permitted to 10,830 ft.
It was permitted by Oxy USA Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Its 4 leases have reported 2.99M barrels of oil and 16.7M mcf of gas since January 1993, last reporting in July 2026. The leases carry 54 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by OXY USA Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | OXY USA WTP LPthrough Apr 2026 |
| Latest permit | OXY USA Inc.Aug 16, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,830
- total depth, ft
- 1
- permits on file
- Aug 16, 1999
- last permit issued
- Aug 20, 1999
- completed
- 2.99M
- cumulative oil, bbl
- 16.7M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 20, 1999
- Shut in
- —
- Plugged
- Jul 18, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 54 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Moss -E- O-10-17665 | Harper (Ellenburger) | OXY USA WTP EOR, LLC | 7 | 601K | 601K | Jan 1993 – Jul 2026 |
| Harper Devonian Unit O-10-20609 | Harper (Devonian) | OXY USA WTP EOR, LLC | 42 | 2.33M | 16M | Jan 1993 – Jul 2026 |
| Moss E O-10-36119 | Harper (Strawn) | Hilcorp Energy Company | 3 | 62.9K | 136K | Aug 1999 – Jul 2026 |
| Moss -E- O-10-17725 | Harper (Fusselman) | OXY USA Inc. | 2 | 0 | 0 | Jan 1993 – May 2000 |
Oil, barrels lease total
Last 12 months 35,387 · prior 12 35,334(+0%)
Gas, mcf lease total
Last 12 months 156,490 · prior 12 141,504(+11%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1OXY USA Inc.Jan 1993 → Dec 2000
- 2OXY USA WTP LPJan 2001 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 486667-99 | Recompletion | OXY USA Inc. | Aug 16, 1999 | Aug 16, 1999 | Jul 28, 1999 | 10,830 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-17665 | — | — | — | — |
| — | — O-10-17725 | — | — | — | — |
| — | — O-10-20609 | — | — | — | — |
| — | — O-10-20609 | — | — | — | — |
| — | — O-10-36119 | — | — | — | — |
| — | — O-10-36119 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,786 | 8,846 | Perforated |
| 9,747 | 9,859 | Perforated |
| — | 10,898 | Perforated |
| — | 11,971 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 329 | 17.5 | 360 S |
| 13.375 | 329 | — | — |
| 9.625 | 4,399 | 12.25 | 2,050 S |
| 9.625 | 4,399 | — | — |
| 2 | 9,646 | — | — |
| 2 | 10,836 | — | — |
| 7 | 11,975 | 8.75 | 925 S |
| 7 | 11,975 | — | — |
| 2 | 11,998 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 30, 1999 | Sep 22, 1999 | — |
| 00 | Dec 9, 1999 | — | — |
| 00 | Nov 10, 1999 | May 10, 1963 | — |
| 00 | Jan 12, 1984 | May 17, 1963 | — |
| 00 | Jan 12, 1984 | May 10, 1963 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-10049 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-10049 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13510049, documented in the API reference.