TEXAS · WELLS · ECTOR COUNTY · API 42-135-20022 · DISTRICT 7B
Goldsmith C. A. et Al #1021
Ector County · Goldsmith (Grayburg) field · Temp Abandoned · Vertical
Goldsmith C. A. ET AL #1021 (API 42-135-20022) is a well in Ector County operated by Hilcorp Energy Company, completed May 15, 1995 and listed as temp abandoned on the RRC schedule, shut in September 1, 2015.
The RRC has issued one drilling permit, issued March 28, 1995, permitted to 4,300 ft.
It was permitted by Chevron U. S. A. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report one formation top, including Red Beds.
Its 2 leases have reported 8.37M barrels of oil and 11.6M mcf of gas since January 1993, last reporting in July 2026. The leases carry 700 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Aug 2015 |
| Latest permit | Chevron U. S. A. Inc.Mar 28, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,300
- total depth, ft
- 1
- permits on file
- Mar 28, 1995
- last permit issued
- May 15, 1995
- completed
- 8.37M
- cumulative oil, bbl
- 11.6M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 15, 1995
- Shut in
- Sep 1, 2015
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 700 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Goldsmith, C. A. et Al G-10-154657 | Goldsmith (Grayburg) | Hilcorp Energy Company | 1 | 0 | 1.62M | May 1995 – Jul 2026 |
| Goldsmith, C. A., Etal O-10-2290 | Goldsmith (5600) | XTO Energy Inc. | 699 | 8.37M | 9.94M | Jan 1993 – Jan 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
- 2XTO Energy Inc.Aug 2004 → Aug 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 433039-99 | Recompletion | Chevron U. S. A. Inc. | Feb 16, 1995 | Mar 28, 1995 | May 8, 1995 | 3,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 15, 1995 | Goldsmith C. A. et Al G-10-154657 | Goldsmith (Grayburg) | Hilcorp Energy Company | Temp Abandoned · shut in Sep 1, 2015 | 4,300 |
| May 1, 1967 | Goldsmith C. A. Etal O-10-2290 | Goldsmith (5600) | XTO Energy Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,108 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Beds | 1,345 | 1,763 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,642 | 3,717 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,348 | 12.25 | 350 S |
| 5.5 | 5,605 | 7.875 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 27, 1996 | Jun 20, 1996 | — |
| 00 | Sep 1, 1995 | Jun 23, 1995 | Yes |
| 00 | Jul 13, 1995 | — | — |
| 00 | Jan 12, 1984 | May 15, 1967 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-20022 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-20022 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13520022, documented in the API reference.