TEXAS · WELLS · ECTOR COUNTY · API 42-135-20022 · DISTRICT 7B

Goldsmith C. A. et Al #1021

Shut in

Ector County · Goldsmith (Grayburg) field · Temp Abandoned  · Vertical

Goldsmith C. A. ET AL #1021 (API 42-135-20022) is a well in Ector County operated by Hilcorp Energy Company, completed May 15, 1995 and listed as temp abandoned on the RRC schedule, shut in September 1, 2015.

The RRC has issued one drilling permit, issued March 28, 1995, permitted to 4,300 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report one formation top, including Red Beds.

Its 2 leases have reported 8.37M barrels of oil and 11.6M mcf of gas since January 1993, last reporting in July 2026. The leases carry 700 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Aug 2015
Latest permitChevron U. S. A. Inc.Mar 28, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,300
total depth, ft
1
permits on file
Mar 28, 1995
last permit issued
May 15, 1995
completed
8.37M
cumulative oil, bbl
11.6M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 15, 1995
Shut in
Sep 1, 2015
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 700 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldsmith, C. A. et Al G-10-154657Goldsmith (Grayburg)Hilcorp Energy Company101.62MMay 1995 – Jul 2026
Goldsmith, C. A., Etal O-10-2290Goldsmith (5600)XTO Energy Inc.6998.37M9.94MJan 1993 – Jan 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
  2. 2XTO Energy Inc.Aug 2004 → Aug 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
433039-99RecompletionChevron U. S. A. Inc.Feb 16, 1995Mar 28, 1995May 8, 19953,800

Completions

CompletedLeaseFieldOperatorStatusDepth
May 15, 1995Goldsmith C. A. et Al G-10-154657Goldsmith (Grayburg)Hilcorp Energy CompanyTemp Abandoned · shut in Sep 1, 20154,300
May 1, 1967Goldsmith C. A. Etal O-10-2290Goldsmith (5600)XTO Energy Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 3,108 ft elevation.Download CSV →

FormationMD ftSubsea
Red Beds1,3451,763

Perforations

Perforated and open-hole intervals.

FromToType
3,6423,717Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,34812.25350 S
5.55,6057.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 27, 1996Jun 20, 1996—
00Sep 1, 1995Jun 23, 1995Yes
00Jul 13, 1995——
00Jan 12, 1984May 15, 1967—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13520022, documented in the API reference.