TEXAS · WELLS · ECTOR COUNTY · GOLDSMITH, C. A., ETAL LEASE · API 42-135-21085 · DISTRICT 7B
Goldsmith C. A. Etal #987
Ector County · Goldsmith (5600) field · Directional · Sidetrack
Goldsmith C. A. Etal #987 (API 42-135-21085) is a plugged well in Ector County, plugged August 7, 2001, last operated by Xto Energy Inc..
The RRC has issued 3 drilling permits (amended once) between 1983 and 1998, permitted to 6,870 ft.
It was permitted by Chevron U. S. A. Inc. and has since transferred to Xto Energy Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including 5600, Tubb.
Its lease has reported 8.37M barrels of oil and 9.94M mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 699 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Sep 2006 |
| Latest permit | Chevron U. S. A. Inc.Sep 22, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,870
- total depth, ft
- 4
- permits on file
- Sep 22, 1998
- last permit issued
- Dec 2, 1997
- completed
- 8.37M
- cumulative oil, bbl
- 9.94M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 2, 1997
- Shut in
- —
- Plugged
- Aug 7, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 699 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Goldsmith, C. A., Etal O-10-2290 | Goldsmith (5600) | XTO Energy Inc. | 699 | 8.37M | 9.94M | Jan 1993 – Sep 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
- 2XTO Energy Inc.Aug 2004 → Sep 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 479506-98 | Recompletion · sidetrack | Chevron U. S. A. Inc. | Oct 7, 1998 | Sep 22, 1998 | Oct 5, 1997 | 5,820 |
| 479506-99 | Recompletion · sidetrack | Chevron U. S. A. Inc. | Sep 17, 1998 | Sep 22, 1998 | — | 5,820 |
| 294262-99 | Recompletion | Chevron U. S. A. Inc. | Nov 25, 1985 | Jan 3, 1986 | — | 6,566 |
| 215381-99 | Drill | Gulf Oil Corp. | Aug 30, 1983 | Sep 29, 1983 | — | 6,870 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 2, 1997 | Goldsmith C. A. Etal O-10-2290 | Goldsmith (5600) | XTO Energy Inc. | Plugged | — |
| Dec 2, 1997 | Goldsmith C. A. Etal O-10-2290 | Goldsmith (5600) | XTO Energy Inc. | Plugged | — |
| Dec 1, 1983 | Goldsmith C. A. Etal O-10-2100 | Goldsmith (Clear Fork) | Hilcorp Energy Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,117 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 5600 | 5,405 | -2,288 |
| Tubb | 6,075 | -2,958 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,463 | 5,754 | Perforated |
| 5,465 | 5,755 | Perforated |
| 6,054 | 6,395 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,394 | 12.25 | 525 S |
| 8.625 | 1,394 | — | 525 S |
| 2.875 | 5,278 | — | — |
| 5.5 | 5,800 | 7.875 | 600 S |
| 5.5 | 5,800 | — | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 30, 1998 | Dec 22, 1997 | — |
| 00 | Apr 11, 1997 | Mar 10, 1997 | — |
| 00 | Jul 11, 1986 | Jun 19, 1985 | Yes |
| 00 | Apr 11, 1984 | Dec 16, 1983 | — |
| 00 | Apr 6, 1984 | Dec 16, 1983 | — |
| 00 | Jan 12, 1984 | Jun 29, 1966 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-21085 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-21085 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease