TEXAS · WELLS · ECTOR COUNTY · API 42-135-30200 · DISTRICT 7B
Goldsmith C. A. Etal #1229
Ector County · Goldsmith (Clear Fork) field · Shut In · Vertical
- Permitted field
- Goldsmith (5600)
Goldsmith C. A. Etal #1229 (API 42-135-30200) is a well in Ector County operated by Hilcorp Energy Company, completed May 24, 2009 and listed as shut in on the RRC schedule, shut in May 1, 2009.
The RRC has issued 2 drilling permits between 1983 and 1989, permitted to 6,500 ft.
It was permitted by Chevron U. S. A. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 3 formation tops, including 5600, Tubb, Clear Fork.
Its 2 leases have reported 26.8M barrels of oil and 53M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 1,583 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,458
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Chevron U. S. A. Inc.Apr 13, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,500
- total depth, ft
- 2
- permits on file
- Apr 13, 1989
- last permit issued
- May 24, 2009
- completed
- 26.8M
- cumulative oil, bbl
- 53M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 24, 2009
- Shut in
- May 1, 2009
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 1,583 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Goldsmith, C. A., Etal O-10-2100 | Goldsmith (Clear Fork) | Hilcorp Energy Company | 884 | 18.5M | 43.1M | Jan 1993 – Apr 2026 |
| Goldsmith, C. A., Etal O-10-2290 | Goldsmith (5600) | XTO Energy Inc. | 699 | 8.37M | 9.94M | Jan 1993 – Sep 2006 |
Oil, barrels lease total
Last 12 months 245,825 · prior 12 213,540(+15%)
Gas, mcf lease total
Last 12 months 399,792 · prior 12 252,239(+58%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
- 2XTO Energy Inc.Aug 2004 → Mar 2025
- 3Hilcorp Energy CompanyApr 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 358015-99 | Recompletion | Chevron U. S. A. Inc. | Apr 11, 1989 | Apr 13, 1989 | — | 6,500 |
| 219062-99 | Recompletion | Gulf Oil Corp. | Oct 11, 1983 | Oct 14, 1983 | — | 6,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 24, 2009 | Goldsmith C. A. Etal O-10-2100 | Goldsmith (Clear Fork) | Hilcorp Energy Company | Shut In · shut in May 1, 2009 | 6,500 |
| May 22, 1989 | Goldsmith C. A. Etal O-10-2290 | Goldsmith (5600) | XTO Energy Inc. | Not on Schedule | — |
| Nov 23, 1983 | Goldsmith C. A. Etal O-10-2100 | Goldsmith (Clear Fork) | Hilcorp Energy Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,122 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 5600 | 5,356 | -2,234 |
| Tubb | 6,021 | -2,899 |
| Clear ForkCLEARFORK | 6,124 | -3,002 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,356 | 5,724 | Perforated |
| 6,124 | 6,225 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,470 | 12.25 | 550 S |
| 5.5 | 5,760 | 7.875 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 14, 2009 | Jul 28, 2009 | — |
| 00 | Jan 31, 2007 | Dec 7, 1989 | — |
| 00 | Jan 15, 1990 | Dec 7, 1989 | — |
| 00 | Nov 12, 1984 | Oct 31, 1984 | — |
| 00 | Feb 28, 1984 | Dec 21, 1983 | — |
| 00 | Feb 24, 1984 | Dec 21, 1983 | — |
| 00 | Jan 12, 1984 | Mar 20, 1970 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-30200 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-30200 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13530200, documented in the API reference.