WELL · 42-135-34320 · DISTRICT 8

Goldsmith C. A. Etal #1410

Plugged

Ector County · Goldsmith (5600) field  · Vertical

Goldsmith C. A. Etal #1410 (API 42-135-34320) is a plugged well in Ector County, plugged May 9, 2023, last operated by Xto Energy Inc..

The RRC has issued 2 drilling permits between 1983 and 1985, permitted to 6,650 ft.

It was permitted by Gulf Oil Corp. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including 5600, Tubb.

Its 2 leases have reported 26.8M barrels of oil and 53M mcf of gas since January 1993, last reporting in July 2026. The leases carry 1,583 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Permitted by Gulf Oil Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitGulf Oil Corp.Jun 28, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,650
total depth, ft
2
permits on file
Jun 28, 1985
last permit issued
Jun 26, 1985
completed
26.8M
cumulative oil, bbl
53M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 26, 1985
Shut in
—
Plugged
May 9, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 1,583 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldsmith, C. A., Etal O-10-2100Goldsmith (Clear Fork)Hilcorp Energy Company88418.5M43.1MJan 1993 – Jul 2026
Goldsmith, C. A., Etal O-10-2290Goldsmith (5600)XTO Energy Inc.6998.37M9.94MJan 1993 – Jan 2007

Oil, barrels lease total

Last 12 months 245,825 · prior 12 213,540(+15%)

010K20K30K202420252026

Gas, mcf lease total

Last 12 months 399,792 · prior 12 252,239(+58%)

050K100K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
  2. 2XTO Energy Inc.Aug 2004 → Mar 2025
  3. 3Hilcorp Energy CompanyApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
279017-99RecompletionGulf Oil Corp.Jun 27, 1985Jun 28, 1985—6,600
210153-99DrillGulf Oil Corp.Sep 6, 1983Sep 7, 1983—6,650

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-2100————
—— O-10-2290————

Formation tops

As filed on W-2/G-1. Subsea from 3,194 ft elevation.Download CSV →

FormationMD ftSubsea
56005,220-2,026
Tubb6,161-2,967

Perforations

Perforated and open-hole intervals.

FromToType
5,2966,011Perforated
6,1956,395Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,48912.25600 sx
5.56,5997.8752,204 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 6, 2019Jan 23, 2019—
00Feb 26, 2018Nov 27, 2017—
00Dec 29, 2014Oct 9, 2014—
00Jan 31, 2007Aug 9, 1985—
00Sep 20, 1985Aug 9, 1985—
00Jul 10, 1984Jun 14, 1984—
00Jun 30, 1984Jun 14, 1984—
00Jan 19, 1984Jan 5, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13534320, documented in the API reference.