TEXAS · WELLS · ECTOR COUNTY · GOLDSMITH, C. A., ETAL LEASE · API 42-135-34815 · DISTRICT 7B
Goldsmith C. A. Etal #1523 W
Ector County · Goldsmith (5600) field · Vertical
Goldsmith C. A. Etal #1523 W (API 42-135-34815) is a plugged well in Ector County, plugged June 2, 1999, last operated by Xto Energy Inc..
The RRC has issued one drilling permit, issued February 22, 1985, permitted to 6,350 ft.
It was permitted by Gulf Oil Corp. and has since transferred to Xto Energy Inc. on the wellbore schedule.
Completion filings report one formation top, including 5600'.
Its lease has reported 8.37M barrels of oil and 9.94M mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 699 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Gulf Oil Corp.; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Sep 2006 |
| Latest permit | Gulf Oil Corp.Feb 22, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,350
- total depth, ft
- 1
- permits on file
- Feb 22, 1985
- last permit issued
- Jun 7, 1985
- completed
- 8.37M
- cumulative oil, bbl
- 9.94M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 7, 1985
- Shut in
- —
- Plugged
- Jun 2, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 699 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Goldsmith, C. A., Etal O-10-2290 | Goldsmith (5600) | XTO Energy Inc. | 699 | 8.37M | 9.94M | Jan 1993 – Sep 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
- 2XTO Energy Inc.Aug 2004 → Sep 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 267572-99 | Drill | Gulf Oil Corp. | Feb 21, 1985 | Feb 22, 1985 | — | 6,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 7, 1985 | Goldsmith C. A. Etal O-10-2290 | Goldsmith (5600) | XTO Energy Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,118 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 5600' | 5,182 | -2,064 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,319 | 6,036 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,514 | 12.25 | 700 S |
| 5.5 | 6,299 | 7.875 | 1,475 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 20, 1986 | Mar 7, 1986 | — |
| 00 | Mar 19, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-34815 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-34815 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 474
- bbl, last 12 reported months
- 11.1K
- bbl, all reported
- Sep 1998
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000055367 | H-1 Injection | Plugged Jun 14, 1999 | 500 | 900 | 5,350–6,252 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 474 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13534815, documented in the API reference.