WELL · 42-135-36372 · DISTRICT 10

Gist C #527

N

Ector County  · Directional

Gist C #527 (API 42-135-36372) is a former disposal or injection well in Ector County, last operated by Kerr-Mcgee Corporation; its UIC permit is no longer active.

The RRC has issued one drilling permit (amended once), issued November 1, 1990, permitted to 4,500 ft.

Operator of record

Kerr-McGee Corporation

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Apr 8, 1999
Permits on file
626
Phone
(972) 715-4828

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitKerr-McGee CorporationNov 1, 1990
4,500
total depth, ft
2
permits on file
Nov 1, 1990
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
379872-98DrillKerr-McGee CorporationNov 14, 1990Nov 1, 1990—4,500
379872-99DrillKerr-McGee CorporationOct 22, 1990Nov 1, 1990—4,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000069778H-1 InjectionNot activated1,0001,0004,250–4,520

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13536372, documented in the API reference.