TEXAS · WELLS · ECTOR COUNTY · CUMMINS, H. E. -C- LEASE · API 42-135-37090 · DISTRICT 7B
Cummins H. E. -C- #9R
Ector County · Goldsmith (Clear Fork) field · Shut In · Vertical
Cummins H. E. -C- #9R (API 42-135-37090) is a well in Ector County operated by Formentera Operations LLC, completed December 20, 1995 and listed as shut in on the RRC schedule, shut in January 1, 2021.
The RRC has issued one drilling permit, issued July 17, 1995, permitted to 6,450 ft.
It was permitted by Anadarko Petroleum Corp. and has since transferred to Formentera Operations LLC on the wellbore schedule.
Completion filings report one formation top, including Clear Fork.
Its lease has reported 588K barrels of oil and 1.74M mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 12 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Anadarko Petroleum Corp.; the EWA schedule now lists a different operator.
- Based in
- Austin, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jun 11, 2026
- Permits on file
- 93
- Phone
- (512) 514-5779
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Formentera Operations LLC |
| Production reports | Formentera Operations LLCthrough Apr 2026 |
| Latest permit | Anadarko Petroleum Corp.Jul 17, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,450
- total depth, ft
- 1
- permits on file
- Jul 17, 1995
- last permit issued
- Dec 20, 1995
- completed
- 588K
- cumulative oil, bbl
- 1.74M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1996 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 20, 1995
- Shut in
- Jan 1, 2021
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 12 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cummins, H. E. -C- O-10-11966 | Goldsmith (Clear Fork) | Formentera Operations LLC | 12 | 588K | 1.74M | Jan 1993 – Apr 2026 |
Oil, barrels lease total
Last 12 months 8,771 · prior 12 7,706(+14%)
Gas, mcf lease total
Last 12 months 10,241 · prior 12 11,161(-8%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Anadarko Petroleum CorporationJan 1996 → Mar 2007
- 2Apache CorporationApr 2007 → Jun 2021
- 3Slant Operating, LLCJul 2021 → Oct 2023
- 4Formentera Operations LLCNov 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 437654-99 | Drill | Anadarko Petroleum Corp. | Jul 10, 1995 | Jul 17, 1995 | Nov 10, 1995 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 20, 1995 | Cummins H. E. -C- O-10-11966 | Goldsmith (Clear Fork) | Formentera Operations LLC | Shut In · shut in Jan 1, 2021 | 6,450 |
Formation tops
As filed on W-2/G-1. Subsea from 3,182 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Clear ForkCLEARFORK | 5,466 | -2,284 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,466 | 6,307 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,391 | 12.25 | 600 S |
| 5.5 | 6,405 | 7.875 | 1,450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 6, 1996 | Feb 2, 1996 | Yes |
| 00 | Feb 16, 1996 | — | — |
Well logs
2 logs loaded from the RRC's log index, the latest received Jul 20, 2006. Cased hole, Density, Neutron. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| Neutron PorosityCOMPENSATED NEUTRON (CASED HOLE) W/NGTSpans Clear Fork | TIFF | 5,000 to 6,390 | Jul 20, 2006run Nov 20, 1996 | — |
| Neutron/Density PorosityCOMPENSATED NEUTRON LITHO-DENSITYSpans Clear Fork | TIFF | 0 to 6,446 | Jul 20, 2006run Nov 20, 1995 | — |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-37090 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-37090 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it. The University Lands library has no per-well link: then paste it into its search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000096505 | H-1 Injection | Not activated | 2,500 | 2,650 | 5,466–6,307 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13537090, documented in the API reference.