WELL · 42-135-39469 · DISTRICT 8
Parker Minerals 18A #4
Ector County · Vertical
Parker Minerals 18a #4 (API 42-135-39469) is a permitted well in Ector County filed by Sheridan Production Company, LLC; no completion report is on file yet.
The RRC has issued 2 drilling permits between 2008 and 2013, permitted to 12,000 ft.
Completion filings report 3 formation tops, including San Andres, Glorieta, Clear Fork.
Its lease has reported 188K barrels of oil and 347K mcf of gas since February 2008, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.
Operator of record
Sheridan Production Company, LLC
Houston, TX · P-5 Y, filed May 12, 2020 · 1,009 permits on file · (877) 231-5058
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | FDL Operating, LLCthrough Aug 2020 |
| Latest permit | Sheridan Production Company, LLCJun 7, 2013 |
- 12,000
- total depth, ft
- 2
- permits on file
- Jun 7, 2013
- last permit issued
- —
- completed
- 188K
- cumulative oil, bbl
- 347K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Parker Minerals 18A O-10-38821 | Goldsmith (Clear Fork) | Acoma Operating, LLC | 8 | 188K | 347K | Feb 2008 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sandridge Expl. and Prod., LLCFeb 2008 → Jan 2013
- 2Sheridan Production Company, LLCFeb 2013 → Mar 2020
- 3FDL Operating, LLCApr 2020 → Apr 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 763669-99 | Recompletion | Sheridan Production Company, LLC | May 30, 2013 | Jun 7, 2013 | — | 6,200 |
| 656655-99 | Drill | Neg Operating LLC | Mar 4, 2008 | Mar 14, 2008 | Apr 22, 2008 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-38821 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,177 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 4,208 | -1,031 |
| Glorieta | 5,118 | -1,941 |
| Clear Fork | 5,333 | -2,156 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,616 | 5,790 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,493 | 12.25 | 615 S |
| 5.5 | 6,135 | 7.875 | 685 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 27, 2009 | Jul 16, 2008 | Yes |
| 00 | Apr 13, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-39469 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-39469 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13539469, documented in the API reference.