TEXAS · WELLS · ECTOR COUNTY · PARKER MINERAL LTD. ET AL LEASE · API 42-135-40805 · DISTRICT 7B

Parker Mineral Ltd. et Al #4810

Shut in

Ector County · Goldsmith (Clear Fork) field · Shut In  · Vertical

Parker Mineral Ltd. ET AL #4810 (API 42-135-40805) is a well in Ector County operated by Acoma Operating LLC, completed March 24, 2011 and listed as shut in on the RRC schedule, shut in May 1, 2022.

The RRC has issued 2 drilling permits between 2011 and 2014, permitted to 6,181 ft.

It was permitted by Sheridan Production Company, LLC and has since transferred to Acoma Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Yates, Queen, San Andres, Clear Fork.

Its lease has reported 151K barrels of oil and 268K mcf of gas since November 2006, last reporting in July 2026. The lease carries 17 wells, so these are lease totals, not this well alone.

Operator of record

Acoma Operating LLC

Permitted by Sheridan Production Company, LLC; the EWA schedule now lists a different operator.

Based in
Lubbock, TX
P-5 status
Active (A)
P-5 last filed
Sep 3, 2025
Permits on file
9
Phone
(806) 507-9070

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsContango Resources, LLCthrough Apr 2022
Latest permitSheridan Production Company, LLCNov 13, 2014
6,181
total depth, ft
2
permits on file
Nov 13, 2014
last permit issued
Mar 24, 2011
completed
151K
cumulative oil, bbl
268K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 24, 2011
Shut in
May 1, 2022
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 17 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Parker Mineral Ltd. et Al O-10-37944Goldsmith (Clear Fork)Acoma Operating, LLC17151K268KNov 2006 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Neg Operating LLCNov 2006 → Mar 2008
  2. 2Sandridge Expl. and Prod., LLCApr 2008 → Jan 2013
  3. 3Sheridan Production Company, LLCFeb 2013 → Mar 2020
  4. 4FDL Operating, LLCApr 2020 → Nov 2021
  5. 5Contango Resources, Inc.Dec 2021 → Dec 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
800025-99RecompletionSheridan Production Company, LLCNov 11, 2014Nov 13, 2014—6,200
709662-99DrillSandridge Expl. and Prod., LLCFeb 3, 2011Feb 4, 2011Feb 26, 20116,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 24, 2011Parker Mineral Ltd. et Al O-10-37944Goldsmith (Clear Fork)Acoma Operating LLCShut In · shut in May 1, 20226,181

Formation tops

As filed on W-2/G-1. Subsea from 3,209 ft elevation.Download CSV →

FormationMD ftSubsea
Yates2,820389
Queen3,727-518
San Andres4,263-1,054
Clear Fork5,425-2,216

Perforations

Perforated and open-hole intervals.

FromToType
5,7045,784Perforated
5,8305,936Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,40312.25690 S
5.56,1817.875340 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 11, 2012Apr 15, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13540805, documented in the API reference.