WELL · 42-135-41339 · DISTRICT 8

Goldsmith-Landreth /Deep/ Unit #451

Y

Ector County · Goldsmith (Clear Fork) field · Injection  · Directional

Goldsmith-Landreth /Deep/ Unit #451 (API 42-135-41339) is a well in Ector County operated by Occidental Permian Ltd., completed February 1, 2023 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued September 26, 2011, permitted to 6,489 ft.

Completion filings report 3 formation tops, including Yates, Grayburg, Clear Fork.

Its lease has reported 34.4M barrels of oil and 51.5M mcf of gas since January 1993, last reporting in July 2026. The lease carries 655 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 235K barrels injected in the 12 months reported through February 2026.

Operator of record

Occidental Permian Ltd.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 2, 2026
Permits on file
6,251
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOccidental Permian Ltd.
Production reportsOccidental Permian Ltd.through Apr 2026
Latest permitOccidental Permian Ltd.Sep 26, 2011
6,489
total depth, ft
2
permits on file
Sep 26, 2011
last permit issued
Feb 1, 2023
completed
34.4M
cumulative oil, bbl
51.5M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 1, 2023
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 655 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldsmith-Landreth /Deep/ Unit O-10-19815Goldsmith (Clear Fork)Occidental Permian Ltd.65534.4M51.5MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 576,667 · prior 12 572,925(+1%)

050K100K202420252026

Gas, mcf lease total

Last 12 months 722,216 · prior 12 737,774(-2%)

050K100K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyJan 1993 → Feb 1997
  2. 2Altura Energy Ltd.Mar 1997 → Apr 2000
  3. 3Occidental Permian Ltd.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
724654-98DrillOccidental Permian Ltd.Sep 29, 2011Sep 26, 2011Dec 1, 20116,600
724654-99DrillOccidental Permian Ltd.Sep 20, 2011Sep 26, 2011—6,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 1, 2023Goldsmith-Landreth /Deep/ Unit O-10-19815Goldsmith (Clear Fork)Occidental Permian Ltd.Injection6,489

Formation tops

As filed on W-2/G-1. Subsea from 3,173 ft elevation.Download CSV →

FormationMD ftSubsea
Yates2,671502
Grayburg3,828-655
Clear Fork5,423-2,250
Clear ForkCLEARFORK5,423-2,250

Perforations

Perforated and open-hole intervals.

FromToType
5,4406,400Perforated
6,1446,400Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,44012.25920 S
5.56,4957.875430 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 23, 2023Mar 5, 2023—
00Jan 3, 2017Dec 13, 2016—
00Oct 29, 2013Jun 17, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

235K
bbl, last 12 reported months
3.13M
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104723H-1 InjectionActive5,0002,6005,200–6,600

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 235,072 · prior 12 239,642(-2%)

010K20K30K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13541339, documented in the API reference.