TEXAS · WELLS · ECTOR COUNTY · API 42-135-42362 · DISTRICT 7B
Goldsmith Andector Unit #H 25
Ector County · Goldsmith (Clear Fork) field · Producing · Directional
Goldsmith Andector Unit #H 25 (API 42-135-42362) is a well in Ector County operated by Maverick Permian LLC, completed September 18, 2013 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued March 8, 2013, permitted to 6,650 ft.
It was permitted by Conocophillips Company and has since transferred to Maverick Permian LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Clear Fork, Wichita-Albany.
Its 2 leases have reported 14.3M barrels of oil and 162M mcf of gas since January 1993, last reporting in July 2026. The leases carry 626 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Conocophillips Company; the EWA schedule now lists a different operator.
- Based in
- Keithville, LA
- P-5 status
- Active (A)
- P-5 last filed
- Jan 28, 2026
- Permits on file
- 12
- Phone
- (318) 751-3917
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Maverick Permian LLC |
| Production reports | Maverick Permian LLCthrough Apr 2026 |
| Latest permit | Conocophillips CompanyMar 8, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,650
- total depth, ft
- 2
- permits on file
- Mar 8, 2013
- last permit issued
- Sep 18, 2013
- completed
- 14.3M
- cumulative oil, bbl
- 162M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 18, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 626 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Goldsmith Andector Unit G-10-276994 | Goldsmith (Clear Fork) | Maverick Permian LLC | 1 | 0 | 617K | Apr 2015 – Jul 2026 |
| Goldsmith Andector Unit O-10-21193 | Goldsmith (Clear Fork) | Maverick Permian LLC | 625 | 14.3M | 162M | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 1,287,414 · prior 12 2,097,578(-39%)
Oil, barrels lease total
Last 12 months 119,328 · prior 12 145,888(-18%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Phillips Petroleum CompanyJan 1993 → Dec 2002
- 2Conocophillips CompanyJan 2003 → Mar 2022
- 3Maverick Permian LLCApr 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 758119-98 | Drill | Conocophillips Company | May 21, 2013 | Mar 8, 2013 | Aug 27, 2013 | 7,100 |
| 758119-99 | Drill | Conocophillips Company | Mar 7, 2013 | Mar 8, 2013 | — | 7,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 18, 2013 | Goldsmith Andector Unit G-10-276994 | Goldsmith (Clear Fork) | Maverick Permian LLC | Producing | 6,650 |
| Sep 18, 2013 | Goldsmith Andector Unit O-10-21193 | Goldsmith (Clear Fork) | Maverick Permian LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,253 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Clear ForkUPPER CLEARFORK | 5,462 | -2,209 |
| Clear ForkLOWER CLEARFORK | 6,062 | -2,809 |
| Wichita-AlbanyWICHITA ALBANY | 6,508 | -3,255 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,475 | 5,883 | Perforated |
| 6,207 | 6,458 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,487 | 12.25 | 765 S |
| 5.5 | 6,690 | 7.875 | 1,030 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 26, 2015 | Jun 10, 2015 | Yes |
| 00 | Jul 6, 2014 | Dec 16, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-42362 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-42362 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13542362, documented in the API reference.