TEXAS · WELLS · ECTOR COUNTY · TXL 41 LEASE · API 42-135-42639 · DISTRICT 7B

TXL 41 #7

Shut in

Ector County · TXL (Wichita Albany South) field · Shut In  · Vertical

Txl 41 #7 (API 42-135-42639) is a well in Ector County operated by Formentera Operations LLC, completed December 13, 2013 and listed as shut in on the RRC schedule, shut in December 1, 2017.

The RRC has issued one drilling permit, issued July 3, 2013, permitted to 7,414 ft.

It was permitted by Apache Corporation and has since transferred to Formentera Operations LLC on the wellbore schedule.

Completion filings report 3 formation tops, including San Andres, Clear Fork, Wichita-Albany.

Its lease has reported 33.5K barrels of oil and 118K mcf of gas since October 2013, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

Formentera Operations LLC

Permitted by Apache Corporation; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 11, 2026
Permits on file
90
Phone
(512) 514-5779

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFormentera Operations LLC
Production reportsSlant Operating, LLCthrough Aug 2022
Latest permitApache CorporationJul 3, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,414
total depth, ft
1
permits on file
Jul 3, 2013
last permit issued
Dec 13, 2013
completed
33.5K
cumulative oil, bbl
118K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 13, 2013
Shut in
Dec 1, 2017
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
TXL 41 O-10-44642TXL (Wichita Albany, South)Formentera Operations LLC833.5K118KOct 2013 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Apache CorporationOct 2013 → Mar 2020
  2. 2Slant Operating, LLCOct 2021 → Aug 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
765869-99DrillApache CorporationJul 2, 2013Jul 3, 2013Oct 21, 20137,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 13, 2013TXL 41 O-10-44642TXL (Wichita Albany South)Formentera Operations LLCShut In · shut in Dec 1, 20177,414

Formation tops

As filed on W-2/G-1. Subsea from 3,185 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,044-859
Clear ForkCLEARFORK6,277-3,092
Wichita-AlbanyWICHITA ALBANY6,552-3,367

Perforations

Perforated and open-hole intervals.

FromToType
6,6126,796Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,39211725 S
5.57,4077.8751,650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 30, 2014Mar 31, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13542639, documented in the API reference.