TEXAS · WELLS · ECTOR COUNTY · GOLDSMITH, C. A., ETAL LEASE · API 42-135-43383 · DISTRICT 7B

Goldsmith C. A. Etal #2524

Shut in

Ector County · Goldsmith (Clear Fork) field · Shut In  · Vertical

Goldsmith C. A. Etal #2524 (API 42-135-43383) is a well in Ector County operated by Hilcorp Energy Company, completed December 13, 2016 and listed as shut in on the RRC schedule, shut in February 1, 2020.

The RRC has issued one drilling permit, issued August 31, 2015, permitted to 6,667 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 10 formation tops, including Rslr, Salado, Tansill, Yates.

Its lease has reported 18.5M barrels of oil and 43.1M mcf of gas since January 1993, last reporting in July 2026. The lease carries 884 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Aug 31, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,667
total depth, ft
1
permits on file
Aug 31, 2015
last permit issued
Dec 13, 2016
completed
18.5M
cumulative oil, bbl
43.1M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 13, 2016
Shut in
Feb 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 884 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldsmith, C. A., Etal O-10-2100Goldsmith (Clear Fork)Hilcorp Energy Company88418.5M43.1MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 245,825 · prior 12 213,540(+15%)

010K20K30K202420252026

Gas, mcf lease total

Last 12 months 399,792 · prior 12 252,239(+58%)

050K100K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
  2. 2XTO Energy Inc.Aug 2004 → Mar 2025
  3. 3Hilcorp Energy CompanyApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
809342-99DrillXTO Energy Inc.Aug 10, 2015Aug 31, 2015Sep 5, 20166,915

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 13, 2016Goldsmith C. A. Etal O-10-2100Goldsmith (Clear Fork)Hilcorp Energy CompanyShut In · shut in Feb 1, 20206,667

Formation tops

As filed on W-2/G-1. Subsea from 3,130 ft elevation.Download CSV →

FormationMD ftSubsea
Rslr1,4181,712
Salado1,5361,594
Tansill2,563567
Yates2,651479
Seven Rivers2,772358
Queen3,538-408
Grayburg3,723-593
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO3,992-862
Holt4,802-1,672
Santa RosaSANTA ROSA BASE——

Perforations

Perforated and open-hole intervals.

FromToType
5,2476,392Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,42211535 S
5.56,6677.8751,246 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 18, 2017Jan 13, 2017Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13543383, documented in the API reference.