WELL · 42-137-31505 · DISTRICT 1
Newby G. U. 3 #1
Edwards County · Vinegarone E. (Penn. Sand) field · Producing · Vertical
Newby G. U. 3 #1 (API 42-137-31505) is a well in Edwards County operated by Hilcorp Energy Company, completed March 23, 1999 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued February 17, 1999, permitted to 10,300 ft.
It was permitted by Tesoro E&P Company, L.P. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report one formation top, including Canyon.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Tesoro E&P Company, L.P.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Tesoro E&P Company, L.P.Feb 17, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,300
- total depth, ft
- 1
- permits on file
- Feb 17, 1999
- last permit issued
- Mar 23, 1999
- completed
- 0
- cumulative oil, bbl
- 1.88M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1999 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 23, 1999
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Newby G. U. 3 G-1-172566 | Vinegarone, E. (Penn. Sand) | Hilcorp Energy Company | 1 | 0 | 1.88M | Mar 1999 – Jul 2026 |
Gas, mcf lease total
Last 12 months 14,099 · prior 12 12,119(+16%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tesoro E&P Company, L.P.Mar 1999 → Dec 1999
- 2Eex E&P Company, L.P.Jan 2000 → Jul 2003
- 3Newfield Exploration CompanyAug 2003 → Sep 2016
- 4Hilcorp Energy CompanyOct 2016 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 482748-99 | Drill | Tesoro E&P Company, L.P. | Feb 17, 1999 | Feb 17, 1999 | Feb 21, 1999 | 10,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-172566 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,031 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Canyon | 8,775 | -6,744 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,846 | 8,860 | Perforated |
| 8,902 | 8,920 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,801 | 12.25 | 632 S |
| 4.5 | 9,200 | 8.5 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 17, 1999 | Apr 16, 1999 | Yes |
| 00 | Apr 29, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-137-31505 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-137-31505 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13731505, documented in the API reference.