TEXAS · WELLS · EDWARDS COUNTY · HOLMAN-FAGAN LEASE · API 42-137-31516 · DISTRICT 01

Holman-Fagan #4301

Shut in

Edwards County · Frances Hill (Penn Lower) field · Temp Abandoned  · Vertical

Holman-Fagan #4301 (API 42-137-31516) is a well in Edwards County operated by Texakoma E & P LLC, completed September 15, 1999 and listed as temp abandoned on the RRC schedule, shut in November 1, 2024.

The RRC has issued one drilling permit, issued August 19, 1999, permitted to 7,400 ft.

It was permitted by Marshall & Winston, Inc. and has since transferred to Texakoma E & P LLC on the wellbore schedule.

Completion filings report 3 formation tops, including 1st Holman, 2nd Holman, 3rd Holman.

No lease production has been reported under this well’s leases.

Operator of record

Texakoma E & P LLC

Permitted by Marshall & Winston, Inc.; the EWA schedule now lists a different operator.

Based in
Plano, TX
P-5 status
Active – Extension (X)
P-5 last filed
Nov 24, 2025
Permits on file
102
Phone
(972) 701-9106

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexakoma E & P LLC
Production reportsTexakoma E & P, LLCthrough Oct 2024
Latest permitMarshall & Winston, Inc.Aug 19, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,400
total depth, ft
1
permits on file
Aug 19, 1999
last permit issued
Sep 15, 1999
completed
0
cumulative oil, bbl
576K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 15, 1999
Shut in
Nov 1, 2024
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Holman-Fagan G-1-175139Frances Hill (Penn, Lower)Texakoma E & P, LLC10576KSep 1999 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 402(-100%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marshall & Winston, Inc.Sep 1999 → Jun 2017
  2. 2Leverage Operating, LLCJul 2017 → Jul 2017
  3. 3Triple G Operating, LLCAug 2017 → Dec 2021
  4. 4Texakoma E & P, LLCJan 2022 → Oct 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
486810-99DrillMarshall & Winston, Inc.Aug 19, 1999Aug 19, 1999Sep 2, 19997,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 15, 1999Holman-Fagan G-1-175139Frances Hill (Penn Lower)Texakoma E & P LLCTemp Abandoned · shut in Nov 1, 20247,400

Formation tops

As filed on W-2/G-1. Subsea from 2,210 ft elevation.Download CSV →

FormationMD ftSubsea
1ST Holman6,234-4,024
2ND Holman6,540-4,330
3RD Holman6,918-4,708

Perforations

Perforated and open-hole intervals.

FromToType
7,0697,094Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,16512.25475 S
4.57,3487.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 21, 2000Nov 15, 1999Yes
00Dec 27, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13731516, documented in the API reference.