TEXAS · WELLS · EDWARDS COUNTY · SHAW LEASE · API 42-137-31852 · DISTRICT 01

Shaw #7102H

Shut in

Edwards County · Geronimo Creek (Ellenburger) field · Temp Abandoned  · Horizontal

Shaw #7102H (API 42-137-31852) is a horizontal well in Edwards County operated by Hilcorp Energy Company, completed October 17, 2006 and listed as temp abandoned on the RRC schedule, shut in April 1, 2019.

The RRC has issued one drilling permit (amended twice), issued August 2, 2006, permitted to 8,800 ft.

It was permitted by Newfield Exploration Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Strawn, Ellenburger.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Newfield Exploration Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Mar 2019
Latest permitNewfield Exploration CompanyAug 2, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,800
total depth, ft
3
permits on file
Aug 2, 2006
last permit issued
Oct 17, 2006
completed
0
cumulative oil, bbl
1.94M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 17, 2006
Shut in
Apr 1, 2019
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shaw G-1-226574Geronimo Creek (Ellenburger)Hilcorp Energy Company101.94MOct 2006 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Newfield Exploration CompanyNov 2006 → Sep 2016
  2. 2Hilcorp Energy CompanyOct 2016 → Mar 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
623667-97DrillNewfield Exploration CompanyFeb 12, 2007Aug 2, 2006—10,000
623667-98DrillNewfield Exploration CompanyAug 10, 2006Aug 2, 2006—10,000
623667-99DrillNewfield Exploration CompanyAug 1, 2006Aug 2, 2006Aug 31, 200610,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 17, 2006Shaw G-1-226574Geronimo Creek (Ellenburger)Hilcorp Energy CompanyTemp Abandoned · shut in Apr 1, 20198,800

Formation tops

As filed on W-2/G-1. Subsea from 2,247 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn8,765-6,518
Ellenburger8,783-6,536
Strawn9,095-6,848
Ellenburger9,210-6,963

Perforations

Perforated and open-hole intervals.

FromToType
9,34011,525Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,43014.75709 S
79,3409.875895 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 17, 2007Jul 19, 2007—
00May 30, 2007Dec 7, 2006Yes
00May 14, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13731852, documented in the API reference.