WELL · 42-137-31945 · DISTRICT 1

Carpenter #2

Plugged

Edwards County · Jack Mann (Penn) field  · Vertical

Carpenter #2 (API 42-137-31945) is a plugged well in Edwards County, plugged March 15, 2012, last operated by Marshall & Winston Inc..

The RRC has issued one drilling permit, issued February 12, 2008, permitted to 7,000 ft.

Completion filings report 4 formation tops, including Canyon, First Holman, Second Holman, Third Holman.

Operator of record

Marshall & Winston Inc.

Midland, TX · P-5 Y, filed Apr 4, 2026 · 359 permits on file · (432) 553-9747

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarshall & Winston Inc.
Production reportsMarshall & Winston, Inc.through May 2009
Latest permitMarshall & Winston, Inc.Feb 12, 2008
7,000
total depth, ft
1
permits on file
Feb 12, 2008
last permit issued
Mar 18, 2008
completed
0
cumulative oil, bbl
121K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2008 THROUGH Mar 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 18, 2008
Shut in
—
Plugged
Mar 15, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Carpenter G-1-237933Jack Mann (Penn)Marshall & Winston, Inc.10121KMar 2008 – Mar 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marshall & Winston, Inc.Apr 2008 → May 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
654570-99DrillMarshall & Winston, Inc.Feb 4, 2008Feb 12, 2008Feb 19, 20087,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-237933————

Formation tops

As filed on W-2/G-1. Subsea from 2,302 ft elevation.Download CSV →

FormationMD ftSubsea
Canyon3,716-1,414
First Holman5,280-2,978
Second Holman5,560-3,258
Third Holman5,994-3,692

Perforations

Perforated and open-hole intervals.

FromToType
5,9976,040Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,34912.25595 S
4.56,4947.8751,450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 9, 2008May 8, 2008Yes
00Aug 15, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13731945, documented in the API reference.