TEXAS · WELLS · ERATH COUNTY · DESDEMONA FIELD UNIT LEASE · API 42-143-30826 · DISTRICT 6E

Desdemona Field Unit #1

Shut in

Erath County · Desdemona field · Producing  · Vertical

Desdemona Field Unit #1 (API 42-143-30826) is a well in Erath County operated by Morris R. Greenhaw Oil&Gas Inc, completed October 9, 1985 and listed as producing on the RRC schedule, shut in August 1, 2026.

The RRC has issued one drilling permit, issued April 19, 1985, permitted to 3,370 ft.

It was permitted by Sun Expl. & Prod. CO.-Abilene and has since transferred to Morris R. Greenhaw Oil&Gas Inc on the wellbore schedule.

Completion filings report one formation top, including Duke Sand.

No lease production has been reported under this well’s leases.

Operator of record

Morris R. Greenhaw Oil&gas Inc

Permitted by Sun Expl. & Prod. Co.-Abilene; the EWA schedule now lists a different operator.

Based in
Desdemona, TX
P-5 status
Active (A)
P-5 last filed
Oct 8, 2025
Permits on file
2
Phone
(254) 758-2750

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOryx Energy Company
Production reportsMorris R. Greenhaw Oil&gas, Incthrough Mar 2026
Latest permitSun Expl. & Prod. Co.-AbileneApr 19, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,370
total depth, ft
1
permits on file
Apr 19, 1985
last permit issued
Oct 9, 1985
completed
0
cumulative oil, bbl
52.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 9, 1985
Shut in
Aug 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Desdemona Field Unit G-8-123264DesdemonaMorris R. Greenhaw Oil&gas, Inc1052.9KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 419 · prior 12 902(-54%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1North Ridge CorporationJan 1993 → Dec 1995
  2. 2Greenhaw, Morris R Oil & Gas IncOct 1996 → Mar 2004
  3. 3Greenhaw Energy, IncFeb 2001 → Sep 2003
  4. 4Square One Energy, Inc.Apr 2004 → Jun 2015
  5. 5Morris R. Greenhaw Oil&gas, IncDec 2015 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
272827-99DrillSun Expl. & Prod. Co.-AbileneApr 19, 1985Apr 19, 1985—4,999

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 9, 1985Desdemona Field Unit G-8-123264DesdemonaMorris R. Greenhaw Oil&gas IncProducing · shut in Aug 1, 20263,370
Oct 9, 1985Thornton Grady O-8-23090DesdemonaOryx Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 1,455 ft elevation.Download CSV →

FormationMD ftSubsea
Duke Sand2,786-1,331

Perforations

Perforated and open-hole intervals.

FromToType
2,7862,854Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62532812.25250 S
73,3698.75700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 23, 1987Feb 13, 1987—
00Feb 20, 1987——
00Nov 7, 1985Oct 21, 1985Yes
00Nov 6, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14330826, documented in the API reference.