WELL · 42-143-30845 · DISTRICT 7
Mize R.B. E #1
Erath County · Big Sunday Creek (Big Saline) field · Temp Abandoned · Vertical
Mize R.B. E #1 (API 42-143-30845) is a well in Erath County operated by Hexagon Oil And Gas Inc., completed November 11, 1985 and listed as temp abandoned on the RRC schedule, shut in June 1, 2015.
The RRC has issued one drilling permit, issued October 10, 1985, permitted to 4,644 ft.
Completion filings report 4 formation tops, including Big Saline, Marble Falls, Duffer, Barnett.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 16, 2026
- Permits on file
- 221
- Phone
- (817) 263-3500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hexagon Oil and Gas Inc. |
| Production reports | Hexagon Oil and Gas Inc.through May 2015 |
| Latest permit | Hexagon Oil and Gas Inc.Oct 10, 1985 |
- 4,644
- total depth, ft
- 1
- permits on file
- Oct 10, 1985
- last permit issued
- Nov 11, 1985
- completed
- 0
- cumulative oil, bbl
- 143K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 11, 1985
- Shut in
- Jun 1, 2015
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mize, R.B. "E" G-8-119210 | Big Sunday Creek (Big Saline) | Hexagon Oil and Gas Inc. | 1 | 0 | 143K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hexagon Oil and Gas Inc.Jan 1993 → May 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 287092-99 | Drill | Hexagon Oil and Gas Inc. | Oct 10, 1985 | Oct 10, 1985 | Oct 11, 1985 | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 11, 1985 | Mize R.B. E G-8-119210 | Big Sunday Creek (Big Saline) | Hexagon Oil and Gas Inc. | Temp Abandoned · shut in Jun 1, 2015 | 4,644 |
Formation tops
As filed on W-2/G-1. Subsea from 1,197 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Big Saline | 3,590 | -2,393 |
| Marble Falls | 3,965 | -2,768 |
| Duffer | 4,286 | -3,089 |
| BarnettBARNETT SHALE | 4,505 | -3,308 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,601 | 3,655 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 460 | 12.25 | 350 S |
| 4.5 | 4,626 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 3, 1986 | Dec 5, 1985 | Yes |
| 00 | Jan 1, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-143-30845 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-143-30845 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14330845, documented in the API reference.